Home TOC Index Previous Next


Guidelines and standard format for verification of ods production phase-out


Introduction

This document is submitted in response to Decisions 31/42 and 31/47 under which the Executive Committee requested the Secretariat to work with the relevant Implementing Agencies and develop guidelines for submission to the Thirty-second Meeting, setting up an acceptable format and content for the verification of ODS production phase-out. The Secretariat and the World Bank worked closely on this document.

From the very beginning, management of ODS production phase-out under the Multilateral Fund has followed a modality different from that for the ODS consuming sectors. Instead of funding individual projects, ODS production phase-out has adopted a performance-based sector funding scheme under which disbursement of funds is made conditional upon verification that ODS phase-out targets provided for in the sector plan are actually achieved. Adding to the challenge of phase out verification is the gradual production closure adopted by many of the ODS plants included in the sector plans under which ODS production is not closed entirely at once but only scaled down yearly till its final cessation several years in the future.

It is anticipated that the same modality will be followed by other ODS producing Article 5 countries and therefore it is of great importance that an adequate procedure is developed to enable the Executive Committee to monitor these sector ODS production phase out projects.

Purpose

The purpose of the guidelines is to provide standard procedures to be followed in conducting verifications of ODS production phase out (including gradual closures) financed by the Multilateral Fund. The guidelines include the Questionnaire in Annex I.

The Process

Before the field verification, the implementing agency responsible for the ODS production phase out project should ensure that the plant(s) to be audited provide the necessary information, using the Questionnaire attached.

The responsible implementing agency should prepare terms of reference for the verification mission and make available to the verification team, prior to the field visit, the Questionnaire(s) containing baseline enterprise information, annual data reported for the year by the enterprise and a copy of the sector agreement approved by the Executive Committee.

During the plant closure or production audit, the verification team should have full access to the daily production logs and the financial records to validate the data provided by the plant in the Questionnaire.

Based on the field findings against the data provided by the plant in the Questionnaire, the verification team should prepare its verification report for submission to the Executive Committee and attach the filled-in Questionnaire to its report.

Questionnaire for Data Collection

The attached Questionnaire should be filled out by each plant to be audited and made available to the audit team before the field visit to the plant. Thus the verification team would have in hand before departure:

(i) names and locations of producers;

(ii) contact at each corporate headquarters and each plant site;

(iii) number of days in production (operational days) for each month, at each plant site, and for each ODS production monitored at the location;

(iv) monthly production data for the ODS production monitored at each plant site;

(v) monthly consumption and procurement data for feedstock used for the production of the ODS production monitored, (e.g. CTC and AHF for CFC-11 and CFC-12 production);

(vi) monthly sales figures for the ODS product(s) monitored, as well as stock for each monitored ODS production at the beginning and end of each year.

Verification Steps Before Departure

(i) review the data provided by the enterprise and ensure that the ODS production, sales figures and stock at the beginning and end of the years add up.

(ii) compare actual production to annual quota assigned for each ODS production monitored and at each plant site.

(iii) review any quota trading or changes of quotas during the year. Also check if ODS products monitored have been procured from other producers.

(iv) review and verify conformity of raw materials consumption with the ODS production monitored.

(v) based on questionnaire data, identify each campaign and distribute production and raw material consumption data per campaign.

(vi) ensure access to daily production logs and financial records for the ODS productions monitored as necessary for the verification of information provided by the producer.

Verification steps at each Producing Location

(i) confirm production quantities and raw material consumption from production logs.

(ii) verify sales and procurements of monitored ODS products against financial records.

(iii) verify stock at the beginning and the end of year against financial records.

To achieve these results, the production verification should include:

(i) review system of record keeping for adequacy.

(ii) observe plant condition and apparent operational status.

(iii) audit daily production records for monitored ODS production and "key" feedstock consumption data.

(iv) confirm monthly and annual production of monitored ODS:

(production = sales (from sales records) -- change in inventory (from plant records)).

(v) confirm that cumulative inventory change of monitored ODS corresponds to annual production and sales data.

(vi) confirm that cumulative inventory change of "key" raw material is consistent with production, both overall and per campaign.

(vii) integrate hourly in-plant flowrate data, (corrected for concentration if necessary), over time - either graphically or analytically - to get an independent value for production.

(viii) compare the changes in reported feed and product tank levels, integrated with the appropriate correlating factor, to reported raw material usage and CFC production.

(ix) on a spot basis, rationalise hourly plant logs with raw material consumption and, e.g. CFC production. In other words match throughput, for example for a week, with raw material consumption and the monitored ODS production for the same week. Do for at least two or three weeks during each campaign.

(x) review logs for periods of high hourly throughput and compare to reported production. Investigate any possible inconsistency.

(xi) review hourly plant logs during non-campaign time periods to verify non-production.

Verification steps at Complete Closed Location

(i) observe plant condition and apparent operational status.

(ii) verify the data provided in Section D I of the Questionnaire attached.

(iii) provide photographic documentation for the dismantling of the plant (e.g. photo and/or video)

Verification Report

The verification report should provide the results of the teams’ findings and conclusions on the implementation of ODS production phase-out annual programme. The report should include as annexes the completed questionnaires.

Field Verification Team

The verification team should consist of at least two persons.

At least one person should be fluent in the national language and one should be fluent in English language.

(i) one of the verification team members should be familiar with accounting practice and financial auditing.

(ii) one of the verification team members should be a technical expert with experience relevant to the ODS production to be audited.

Questionnaire for ODS Production Phase Out Verification (Including Gradual Closure)

A. Plant identification

Name of enterprise 

 

Plant ref. Number* 

 

Sector plan #* 

 

Sri # * 

 

Address of the Plant 

 

Contact person(s) and Functional Title 

 

Telephone number 

 

Fax number 

 

E-mail Address 

 

B. Verification

Team composition 

 

Leader 

 

Name 

 

Functional title 

 

Member(s) 

 

Name 

 

Functional title

Date of plant visit

Duration of visit 

:

:

 

*As applicable, e.g. SRI# for China’s CFC plants.

Plant History

Date of construction: 

 

ODS Products 

No. Of Lines 

Capacity in Baseline Year* 

Production** 

Baseline Year* 

Year 1 

Year 2 

CFC-11 

         

CFC-12 

         

CFC-13 

         

CFC-113 

         

CFC-114/115 

         

Raw Materials Production*** 

         

HF 

         

CTC 

         

*The year from which data is used for approving the ODS production phase out project.

**Till the year prior to the verification.

***This applies to plants where production of either HF or CTC or both is integrated.

Plant Activity in the Year Verified

I. Plant for Complete Closure

No. of CFC-11/12 lines closed 

 

Date of CFC production ceased 

 

Date of dismantling completed 

 

Verification of destruction of key components by 

[ Name of certifying body] 

Reactor tank(s) dismantled and destroyed 

Yes/No 

Control and monitoring equipment dismantled and destroyed  

Yes/No 

Pipes dismantled and destroyed 

Yes/No 

Utilities dismantled and destroyed 

Yes/No 

Evidence of destruction (photos or videos) 

 

Chance of resuming production 

Yes/No 

Assessment by the verification team to be included in the verification report 

 
Annual CFC-11/12 quotas, production, sales and stocks since the baseline year*

(Please use one table for each CFC product)

CFC Products (CFC-11, CFC-12) 

Baseline Year* 

Year 1 

Year 2** 

Quota 

     

Opening Stock at beginning of year 

     

Production 

     

Sales 

     

Closing stock at end of year 

     

*The year from which data is used to approve the ODS production phase out project.

**Till the year of the verification

Annual HF/CFC and CTC/CFC ratios

Ratio 

Baseline Year 

Year 1 

Year 2 

Year 3 

Year 4 

Year 5 

Year 6* 

CFC-11 

             

HF/CFC-11 ratio 

             

CTC/CFC-11 

             

CFC-12 

             

HF/CFC-12  

             

CTC/CFC-12  

             

* Till the year of the verification

Operational days per year

Type of Production 

Baseline Year 

Year 1 

Year 2 

Year 3 

Year 4 

Year 5  

Year 6* 

CFC-11 

             

CFC-12 

 

 

 

 

 

 

 

*Till the year of the verification.

Monthly CFC-11/12 production and raw material consumption*

CFC Production and CTC consumption:

Month 

CFC-11 

No. of operating days 

CFC-11 Production 

CTC/ CFC-11 Ratio 

CTC Opening Stock 

CTC Procured/ or added to stock 

CTC Closing Stock 

Jan 

             

Feb 

             

Mar 

             

Apr 

             

May 

             

Jun 

             

Jul 

             

Aug 

             

Sept 

             

Oct 

             

Nov 

             

Dec 

             

CFC Production and HF consumption:

Month 

CFC-11 

No. of operating days 

CFC-11 Production 

HF/ CFC–11 Ratio 

HF Opening Stock 

HF Procured/ or added to stock 

HF Closing Stock 

Jan 

             

Feb 

             

Mar 

             

Apr 

             

May 

             

Jun 

             

Jul 

             

Aug 

             

Sept 

             

Oct 

             

Nov 

             

Dec 

             

* Similar tables should be provided for CFC-12 and CFC-113.

(UNEP/OzL.Pro/ExCom/32/44, Decision 32/70, para 85).