Home TOC Index Previous 


Agreement for the total phase-out of CFCs in Turkey


1.   The Executive Committee approves in principle a total of US $9 million in funding for the phased reduction and complete phase-out of consumption of CFC-11, CFC-12 and CFC-115 in Turkey by 2006. This level of funding takes into account the significant acceleration of the agreed phase-out in Turkey and the resulting reduction in ODS emissions. This is the total funding that will be available to Turkey from the Multilateral Fund for the total elimination of CFC use in the refrigeration sector in Turkey as well as for all other sectors using these substances, (e.g., foams, aerosols, solvents, etc.). The agreed level of funding will be paid out in installments in the exact amount of US dollars specified in paragraph 2, and on the basis of the understanding set out in this agreement.

2.   By this agreement, Turkey commits that in exchange for the funding specified below, it will eliminate its total CFC consumption in accordance with the individual and aggregate consumption targets as indicated in Table 1 below.

Table 1. National control targets for CFC-11, CFC-12 and CFC-115 consumption in ODP tonnes

 

1999 Baseline

 

2001

 

2002

 

2003

 

2004

 

2005

 

2006

 

2007

 

2008

 

2009

 

Maximum allowable CFC-12 consumption (ODP tonnes)

 

736

 

700

 

650

 

334

 

166

 

100

 

0

 

0

 

0

 

0

 

Maximum allowable CFC-11 consumption (ODP tonnes)

 

1,049

 

300

 

250

 

200

 

150

 

50

 

0

 

0

 

0

 

0

 

Maximum allowable CFC-115 consumption (ODP tonnes)

 

9

 

9

 

9

 

0

 

0

 

0

 

0

 

0

 

0

 

0

 

Maximum allowable total ODP (ODP tonnes)

 

 

977

 

909

 

534

 

316

 

150

 

0

 

0

 

0

 

0

 

Total agreed funding (US$ million)

 

 

3.5

 

2.5

 

1

 

0.75

 

0.75

 

0.5

 

0

 

0

 

0

 

Agency support cost (US$ million)

 

 

0.295

 

0.175

 

0.150

 

0.045

 

0.03

 

0.03

 

0.03

 

0.03

 

0.025

 

3.   The Executive Committee also agrees in principle that the funds will be provided at the last meeting of the Executive Committee in a given year, for the exact amount listed in the above table for that year and on the basis of an annual implementation plan for the following year, subject to the performance requirements contained in this agreement. Thus, for example, the payment indicated in year 2001 will be for activities to be undertaken in 2002, and so on.

4.   Payments noted in Table 1, other than those for 2001, will be released based on confirmation that: the agreed phase-out targets noted in Table 1 for the previous year have been achieved; it has been verified that the activities planned for the previous year were undertaken in accordance with the annual implementation plan, and CFC phase-out contracts have been signed amounting to at least 80 per cent of the Multilateral Fund funding approved for the relevant annual programme. For example, payment in 2002 for the implementation of the 2003 work programme will be conditional on satisfactory verification that Turkey has, as a minimum, met its consumption targets for 2001 as specified in Table 1 and as provided in detail in the 2002 implementation plan. Payment in 2003 for the 2004 implementation plan will be released based on confirmation that the 2002 consumption targets have been met, all 2002 implementation plan activities have been completed and contracts amounting to at least 80 per cent of the 2002 Multilateral Fund grant have been signed; and so on for future years. In the event that contracts totaling 80 per cent of the Multilateral Fund funding available for a given year have not been signed, funding equivalent to the deficit will be held back and considered for release by the Executive Committee when all additional contracts have been signed and the targets met.

5.   The Government of Turkey agrees to ensure accurate monitoring of the phase-out. The Government of Turkey will provide regular reports, as required by its obligations under the Montreal Protocol and this Agreement. Consumption figures provided under this agreement will be consistent with Turkey’s reports to the Ozone Secretariat under Article 7 of the Montreal Protocol.

6.   The Government of Turkey also agrees to allow independent verification audits as provided for in this agreement, and in addition, external evaluation as may be directed by the Executive Committee, to verify that annual CFC consumption levels correspond to those agreed in Table 1 and that implementation of the sector plan proceeds as scheduled and agreed in annual implementation programmes.

7.   The Turkish refrigeration plan which supports this Agreement, Turkish Country Programme and other related documentation may include estimates of specific funds that were thought to be needed for specific items. Notwithstanding this, the Executive Committee wishes to provide Turkey with maximum flexibility in using the agreed funds to meet the consumption limits agreed in Table 1. The Executive Committee understands that during implementation, the funds provided to Turkey pursuant to this Agreement may be used in any manner consistent with this Agreement that Turkey believes will achieve the smoothest possible CFC phase-out in the refrigeration sector, consistent with operational procedures as agreed between Turkey and the World Bank in the refrigeration sector plan as revised and as indicated in the annual implementation programmes. In the Executive Committee’s acknowledgement of the flexibility available to Turkey to achieve a complete CFC refrigeration sector phase-out, it is noted that Turkey is committing to contribute the level of resources necessary to implement the plan and to achieve the consumption limits in paragraph 2 of this agreement.

8.   The Government of Turkey agrees that the funds being agreed in principle by the Executive Committee at its 35th Meeting for the complete phase-out of CFC-11, CFC-12 and CFC-115 consumption are the total funding that will be available to Turkey to allow its full compliance with the reduction and phase-out as agreed with the Executive Committee of the Multilateral Fund, and that no additional Multilateral Fund resources will be forthcoming for any related activities in the refrigeration sector. It is also understood that aside from the agency fee referred to in paragraph 10 below, the Government of Turkey, the Multilateral Fund, and its Implementing Agencies, and bilateral donors will neither request nor provide further Multilateral Fund-related funding for the accomplishment of the total phase-out of CFCs in the refrigeration sector.

9.   The Government of Turkey agrees that if the Executive Committee meets its obligations under this Agreement, but Turkey does not meet the reduction requirements outlined in paragraph 2, or other requirements outlined in this document, the implementing agency and the Multilateral Fund will withhold funding for subsequent tranches of funding outlined in paragraph 2 until such time as the required reduction has been met. It is clearly understood that the fulfillment of this agreement depends on satisfactory performance by both the Government of Turkey and the Executive Committee of their obligations. In addition, Turkey understands that with respect to all calendar year targets beginning with 2002, as set out in paragraph 2 of this agreement, the Multilateral Fund will reduce the subsequent tranche and therefore the total funding for CFC-11, CFC-12 and CFC-115 phase-out on the basis of US $15,000 per ODP tonne of reduction not achieved in any year.

10.  The World Bank has agreed to be the implementing agency for the implementation of this sector plan which will be completed in 2006. It is also agreed that monitoring will continue until 2009 in order to ensure compliance during the period 2006 to 2009. A fee of 9 per cent of the sector plan annual funding has been agreed in accordance with the provisions of this Agreement, and distributed as shown in Table 1. As the implementing agency, the World Bank will be responsible for the following:

      (a)  ensuring performance and financial verification in accordance with specific World Bank procedures and requirements as specified in the Turkish refrigeration sector plan, as revised;

      (b)  reporting on the implementation of the annual implementation programmes to be included as part of each annual programme starting with the submission for the 2003 annual implementation programme prepared in 2002;

      (c)  providing verification to the Executive Committee that the control targets listed in Table 1 and the associated activities have been met;

      (d)  ensuring that technical reviews undertaken by the World Bank are carried out by appropriate independent technical experts;

      (e)  assisting Turkey in preparation of annual implementation programmes, which will incorporate achievements in previous annual programmes;

      (f)  carrying out required supervision missions;

      (g)  ensuring the presence of an operating mechanism to allow effective, transparent implementation of the programme, and accurate data reporting;

      (h)  verification for the Executive Committee that CFC consumption for the refrigeration sector has been completed based on the schedules listed in Table 1;

      (i)   ensuring that disbursements are made to Turkey based on agreed performance targets in the project and provisions in this Agreement;

      (j)   providing policy development assistance when required.

9.   The funding components of this Decision shall not be modified on the basis of future Executive Committee decisions that may affect the funding of any other consumption sector projects or any other related activities in the country.

(UNEP/OzL.Pro/ExCom/35/67, Decision 35/55, para. 91).

(Supporting document: UNEP/OzL.Pro/ExCom/35/54, 35/54/Corr.1 and 35/54/Add.1).

UNEP/OzL.Pro/2/3                           Report of the Second Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 29 June 1990

UNEP/OzL.Pro/2/3, Annex IV, Appendix I      Indicative List of Categories of Incremental Costs

UNEP/OzL.Pro/4/15, Annex VIII        Date: 29 June 1990, and 25 November 1992

UNEP/OzL.Pro/2/3, Annex IV, Appendix II     Terms of Reference of the Executive Committee

UNEP/OzL.Pro/4/15, Annex X           Date: 29 June 1990 and 25 November 1992

UNEP/OzL.Pro/2/3, Annex IV, Appendix IV    Terms of Reference for the Interim Multilateral Fund

                                                                        Date: 29 June 1990

UNEP/OzL.Pro/3/11                          Report of the Third Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 21 June 1991

UNEP/OzL.Pro/3/11, Annex VI          Rules of Procedure for Meeting of the Executive Committee

UNEP/OzL.Pro/ExCom/3/18/Rev.1, Annex II  of the Interim Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 17 June 1991 and 21 June 1991

UNEP/OzL.Pro/4/15                          Report of the Fourth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 25 November 1992

UNEP/OzL.Pro/4/15, Annex VI          Approved Destruction Technologies

                                                                        Date: 25 November 1992

UNEP/OzL.Pro/4/15, Annex VII         Suggested Regulatory Standards for Destruction Facilities

                                                                        Date: 25 November 1992

UNEP/OzL.Pro/4/15, Annex IX          Terms of Reference for the Multilateral Fund

                                                                        Date: 25 November 1992

UNEP/OzL.Pro/5/12                          Report of the Fifth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 19 November 1993

UNEP/OzL.Pro/6/7                           Report of the Sixth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 7 October 1994

UNEP/OzL.Pro/7/12                          Report of the Seventh Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 27 December 1995

UNEP/OzL.Pro/8/12                          Report of the Eighth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 19 December 1996

UNEP/OzL.Pro/7/12, Annex IV          Categories and Examples of Laboratory Uses

                                                                        Date: 27 December 1995

UNEP/OzL.Pro/7/12, Annex V           Actions to Improve the Financial Mechanism for the Implementation of the Montreal Protocol

                                                                        Date: 27 December 1995

UNEP/OzL.Pro/9/12                          Report of the Ninth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 25 September 1997

UNEP/OzL.Pro/9/12, Annex X           Arrears to the Multilateral Fund from Countries that Had Not Ratified the London Amendment

                                                                        Date: 25 September 1997

UNEP/OzL.Pro/10/9                          Report of the Tenth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 3 December 1998

UNEP/OzL.Pro/11/10                        Report of the Eleventh Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 17 December 1999

UNEP/OzL.Pro/12/9                          Report of the Twelfth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 10 January 2001

UNEP/OzL.Pro/13/10                        Report of the Thirteenth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 26 October 2001

UNEP/OzL.Pro/14/9                          Report of the Fourteenth Meeting of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

                                                                        Date: 5 December 2002

UNEP/OzL.Pro/ExCom/1/2                Report of the First Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 17 December 1990

UNEP/OzL.Pro/ExCom/2/5/Rev.1       Report of the Second Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 15 April 1991

UNEP/OzL.Pro/ExCom/2/5/Rev.1, Annex I     Procedural Arrangements among the International Bank for Reconstruction and Development (World Bank), the United Nations Environment Programme (UNEP and the United Nations Development Programme (UNDP)

                                                                        Date: 15 April 1991

UNEP/OzL.Pro/ExCom/3/18/Rev.1     Report of the Third Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 17 June 1991

UNEP/OzL.Pro/ExCom/3/18/Rev.1, Annex III Implementation Guidelines and Criteria for Project Selection

                                                                        Date: 17 June 1991

UNEP/OzL.Pro/ExCom/4/13/Rev.1     Report of the Fourth Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 18 November 1991

UNEP/OzL.Pro/ExCom/5/4/Rev.2       Agreement between the United Nations Environment Programme as the Treasurer of the Interim Multilateral Fund for the Montreal Protocol and the Executive Committee of the Interim Multilateral Fund established by the Parties to the Montreal Protocol

                                                                        Date: 21 November 1991

UNEP/OzL.Pro/ExCom/5/16              Report of the Fifth Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 22 November 1991

UNEP/OzL.Pro/ExCom/5/16, Annex III          Procedures for Presentation of Country Programmes and Project Proposals to the Executive Committee

                                                                        Date: 22 November 1991

UNEP/OzL.Pro/ExCom/5/16, Annex IV           Bilateral and Regional Co-operation

                                                                        Date: 22 November 1991

UNEP/OzL.Pro/ExCom/5/Inf.2           Agreement between the Executive Committee of the Interim Multilateral Fund for the Implementation of the Montreal Protocol and the International Bank for Reconstruction and Development (World Bank)

                                                                        Date: 10 October 1991

UNEP/OzL.Pro/ExCom/5/Inf.3           Agreement between the Executive Committee of the Interim Multilateral Fund for the Implementation of the Montreal Protocol and the United Nations Development Programme

                                                                        Date: 10 October 1991

UNEP/OzL.Pro/ExCom/5/Inf.4           Agreement between the Executive Committee of the Interim Multilateral Fund for the Implementation of the Montreal Protocol and the United Nations Environment Programme

                                                                        Date: 10 October 1991

UNEP/OzL.Pro/ExCom/7/20              Institutional Strengthening

                                                                        Date: 26 May 1992

UNEP/OzL.Pro/ExCom/7/21 and Rev.1           Further Definition of Incremental Costs

                                                                        Date: 28 May 1992

UNEP/OzL.Pro/ExCom/7/28              Establishment of a Financial Mechanism under Article 10 of the Amended Montreal Protocol

                                                                        Date: 16 June 1992

UNEP/OzL.Pro/ExCom/7/30              Report of the Seventh Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 27 June 1992

UNEP/OzL.Pro/ExCom/7/30, Annex III          Guidelines for Presentation of Projects and Criteria for Project Approval

                                                                        Date: 27 June 1992

UNEP/OzL.Pro/ExCom/7/30, Annex IV           Guidelines for Cost Assessment of Bilateral and Regional Activities

                                                                        Date: 27 June 1992

UNEP/OzL.Pro/ExCom/7/30, Annex V            Whether Support from the Fund Could Be Given Retroactively

                                                                        Date: 27 June 1992

UNEP/OzL.Pro/ExCom/7/30, Annex VI           Should the Fund Finance Activities Related to Enterprises that Are Wholly or Partly Owned by Transnational Corporations

                                                                        Date: 27 June 1992

UNEP/OzL.Pro/ExCom/7/30, Annex VII         Whether the Fund Should Finance Activities Related to Enterprises that Are Wholly or Partly Owned by Countries that Are Not Parties to the Montreal Protocol

                                                                        Date: 27 June 1992

UNEP/OzL.Pro/ExCom/7/Inf.3           Rationale for Funding Institutional Strengthening from the Interim Multilateral Fund of the Montreal Protocol (submitted by the World Bank)

                                                                        Date: 27 May 1992

UNEP/OzL.Pro/ExCom/7/Inf.4           Operational Interpretations of Incremental Costs and Eligible Expenditures for the Interim Multilateral Fund of the Montreal Protocol (submitted by the World Bank)

                                                                        Date: 28 May 1992

UNEP/OzL.Pro/ExCom/8/25, and Add.1          Meeting of the Needs of Article 5 Parties for Controlled Substances during the Grace and Phase Out Periods

                                                                        Date: 21 September 1992, and 17 October 1992

UNEP/OzL.Pro/ExCom/8/29              Report of the Eighth Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 21 October 1992

UNEP/OzL.Pro/ExCom/8/29, Annex III          Sub-Committee Recommendations

                                                                        Date: 21 October 1992

UNEP/OzL.Pro/ExCom/8/29, Annex IV           Agreement between the Executive Committee of the Interim Multilateral Fund for the Implementation of the Montreal Protocol and the United Nations Industrial Development Organization

                                                                        Date: 21 October 1992

UNEP/OzL.Pro/ExCom/9/20              Report of the Ninth Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 12 March 1993

UNEP/OzL.Pro/ExCom/9/20, Annex II            Sub-Committee on Financial Matters

                                                                        Date: 12 March 1993

UNEP/OzL.Pro/ExCom/10/39            Incremental Cost Policies and Operational Interpretation

                                                                        Date: 28 May 1993

UNEP/OzL.Pro/ExCom/10/40            Report of the Tenth Meeting of the Executive Committee of the Multilateral Fund under the Montreal Protocol

                                                                        Date: 01 July 1993

UNEP/OzL.Pro/ExCom/10/40, Annex II          Proposed Three-Year Plan and Budget of the Multilateral Fund (1994-1996)

                                                                        Date: 01 July 1993

UNEP/OzL.Pro/ExCom/11/36            Report of the Eleventh Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 12 November 1993

UNEP/OzL.Pro/ExCom/12/4              Promissory Notes: Report from the Treasurer

                                                                        Date: 3 March 1994

UNEP/OzL.Pro/ExCom/12/6              Uniform Format for Future Financial Reports

                                                                        Date: 18 February 1994

UNEP/OzL.Pro/ExCom/12/30            Review of Project Proposals

                                                                        Date: 6 February 1994

UNEP/OzL.Pro/ExCom/12/32            The Use of Contingency Costs in Project Proposals

                                                                        Date: 16 February 1994

UNEP/OzL.Pro/ExCom/12/33            Report on Strategic Options for Retrofitting of Mobile Air Conditioners and Chillers

                                                                        Date: 21 February 1994

UNEP/OzL.Pro/ExCom/12/34            The Use of Transitional Substances as Substitutes for Ozone Depleting Substances

                                                                        Date: 22 February 1994

UNEP/OzL.Pro/ExCom/12/35            Draft Terms of Reference for the Review under Paragraph 8 of Article 5 of the Montreal Protocol

                                                                        Date: 18 February 1994

UNEP/OzL.Pro/ExCom/12/37            Report of the Twelfth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 31 March 1994

UNEP/OzL.Pro/ExCom/12/37, Annex II          Encashment Schedule for Promissory Notes

                                                                        Date: 31 March 1994

UNEP/OzL.Pro/ExCom/12/37, Annex III         Uniform Format for Annual Financial Reports from Implementing Agencies

                                                                        Date: 31 March 1994

UNEP/OzL.Pro/ExCom/12/37, Annex IV         Recommended Guidelines for Project Reviews

                                                                        Date: 31 March 1994

UNEP/OzL.Pro/ExCom/12/37, Annex V          Terms of Reference for the Review under Paragraph 8 of Article 5 of the Montreal Protocol

                                                                        Date: 31 March 1994

UNEP/OzL.Pro/ExCom/13/42            Projects that Might Realize Net Incremental Savings

                                                                        Date: 17 June 1994

UNEP/OzL.Pro/ExCom/13/46,           Format for the Presentation of Information on Progress of Implementation of Country Programmes

                                                                        Date: 29 June 1994

UNEP/OzL.Pro/ExCom/13/47            Report of the Thirteenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 27 July 1994

UNEP/OzL.Pro/ExCom/13/47, Annex II          Information on Progress of Implementation of Country Programmes

                                                                        Date: 27 July 1994

UNEP/OzL.Pro/ExCom/14/15            Report of the Fourteenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 30 September 1994

UNEP/OzL.Pro/ExCom/14/15, Annex II          Report of the Sub-Committee for the Report on the Review under Paragraph 8 of Article 5 of the Montreal Protocol

                                                                        Date: 30 September 1994

UNEP/OzL.Pro/ExCom/15/44            Options for Incremental Operational Cost Duration in the Domestic Refrigeration Sector (submitted by UNDP, UNIDO and the World Bank)

                                                                        Date: 19 November 1994

UNEP/OzL.Pro/ExCom/15/45            Report of the Fifteenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 16 December 1994

UNEP/OzL.Pro/ExCom/15/45, Annex III         Terms of Reference for an Expert Group on the Production of Substitutes for Ozone Depleting Substances

                                                                        Date: 16 December 1994

UNEP/OzL.Pro/ExCom/16/13            Report of the Ad Hoc Working Group on Project Preparation and Evaluation

                                                                        Date: 8 February 1995

UNEP/OzL.Pro/ExCom/16/16            Incremental Operating Costs and Savings in the Halon Portable Fire Extinguisher Sub-Sector

                                                                        Date: 14 February 1995

UNEP/OzL.Pro/ExCom/16/17            Methodology for Calculation of Incremental Operational Costs in Methylene Chloride Projects

                                                                        Date: 14 February 1995

UNEP/OzL.Pro/ExCom/16/19            Procedural Modification to Assist Policy Communications

                                                                        Date: 10 March 1995

UNEP/OzL.Pro/ExCom/16/20            Report of the Sixteenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 17 March 1995

UNEP/OzL.Pro/ExCom/16/20, Annex II          Actions on Project Preparation and Evaluation

                                                                        Date: 17 March 1995

UNEP/OzL.Pro/ExCom/16/20, Annex III         Procedural Modification to Assist Policy Communications

                                                                        Date: 17 March 1995

UNEP/OzL.Pro/ExCom/16/20, Annex IV         Methodology for Calculation of Incremental Operational Costs in Methylene Chloride Projects

                                                                        Date: 17 March 1995

UNEP/OzL.Pro/ExCom/17/60            Report of the Seventeenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 28 July 1995

UNEP/OzL.Pro/ExCom/17/60, Annex II          Uniform Format for Reporting Progress and Financial Information

                                                                        Date: 28 July 1995

UNEP/OzL.Pro/ExCom/18/68            Strategy Paper for Low-halon Consuming Countries

                                                                        Date: 28 October 1995

UNEP/OzL.Pro/ExCom/18/69            Guidelines for Halon Banking

                                                                        Date: 31 October 1995

UNEP/OzL.Pro/ExCom/18/73            Technology Upgrades

                                                                        Date: 31 October 1995

UNEP/OzL.Pro/ExCom/18/75            Report of the Eighteenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 24 November 1995

UNEP/OzL.Pro/ExCom/18/75, Annex II          Multilateral Fund Secretariat Revised Budget for 1996 and Proposed Budgets for 1997 and 1998

                                                                        Date: 24 November 1995

UNEP/OzL.Pro/ExCom/18/75, Annex V          Recommendations on Projects

                                                                        Date: 24 November 1995

UNEP/OzL.Pro/ExCom/19/4              Revised format for financial and progress reporting

                                                                        Date: 23 April 1996

UNEP/OzL.Pro/ExCom/19/51            Progress of implementation of country programmes

                                                                        Date: 15 April 1996

UNEP/OzL.Pro/ExCom/19/52, Corr.1 Guidelines for renewal of institutional strengthening projects

                                                                        Date: 12 April 1996

UNEP/OzL.Pro/ExCom/19/53            Approaches to the phase-out of ODS in low-ODS-consuming countries

                                                                        Date: 12 April 1996

UNEP/OzL.Pro/ExCom/19/54            Approaches to ODS phase-out in small- and medium-sized enterprises

                                                                        Date: 12 April 1996

UNEP/OzL.Pro/ExCom/19/55, Corr.1 The role of cost-effectiveness thresholds in sectoral phase-out proposals and guidelines for umbrella projects

                                                                        Date: 12 April 1996

UNEP/OzL.Pro/ExCom/19/57            Duration of transitional periods for incremental operating costs and savings

                                                                        Date: 14 April 1996

UNEP/OzL.Pro/ExCom/19/58            Three-year rolling business plan

                                                                        Date: 14 April 1996

UNEP/OzL.Pro/ExCom/19/59            Report of the second meeting of the Expert Group on the production of substitutes for ozone-depleting substances

                                                                        Date: 3 April 1996

UNEP/OzL.Pro/ExCom/19/60            Terms of reference for the study on technology transfer

                                                                        Date: 2 April 1996

UNEP/OzL.Pro/ExCom/19/61            Change of ownership of approved projects

                                                                        Date: 10 April 1996

UNEP/OzL.Pro/ExCom/19/62            Training strategy

                                                                        Date: 12 April 1996

UNEP/OzL.Pro/ExCom/19/64            Report of the Nineteenth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 10 May 1996

UNEP/OzL.Pro/ExCom/19/64, Annex V          Revisions to Data Base Format for Progress and Financial Reporting

                                                                        Date: 10 May 1996

UNEP/OzL.Pro/ExCom/19/64, Annex VI         Preliminary Data on the Production Sector

                                                                        Date: 10 May 1996

UNEP/OzL.Pro/ExCom/19/64, Annex VII        Form for the Sector Phase-Out Plan

                                                                        Date: 10 May 1996

UNEP/OzL.Pro/ExCom/19/64, Annex VIII      Terms of Reference for the Technical Audit

                                                                        Date: 10 May 1996

UNEP/OzL.Pro/ExCom/20/40, Corr.1 Consolidated progress report

                                                                        Date: 24 September 1996

UNEP/OzL.Pro/ExCom/20/56, Rev.1  Progress of implementation of country programmes

                                                                        Date: 9 October 1996

UNEP/OzL.Pro/ExCom/20/57            Discrepancy between the data reported by a Party to the Ozone Secretariat and the data presented by the Party to the Executive Committee of the Multilateral Fund

                                                                        Date: 24 September 1996

UNEP/OzL.Pro/ExCom/20/58            Monitoring and Evaluation System for the Multilateral Fund (a draft report)

                                                                        Date: 24 September 1996

UNEP/OzL.Pro/ExCom/20/59            Concessional lending for ODS phase-out

                                                                        Date: 23 September 1996

UNEP/OzL.Pro/ExCom/20/60            Report on UNEP’s continued work on addressing the needs of low volume ODS consuming countries (LVCs)

                                                                        Date: 23 September 1996

UNEP/OzL.Pro/ExCom/20/61            Phase-out of ozone-depleting substances in small- and medium-sized enterprises (a paper from the Fund Secretariat)

                                                                        Date: 16 September 1996

UNEP/OzL.Pro/ExCom/20/62, Corr.1 Residual sectoral consumption and umbrella projects

                                                                        Date: 23 September 1996

UNEP/OzL.Pro/ExCom/20/63            Report on the first meeting of the Executive Committee’s Subgroup on the Production Sector

                                                                        Date: 11 October 1996

UNEP/OzL.Pro/ExCom/20/64            Guidelines for calculating incremental costs in the tobacco sector

                                                                        Date: 23 September 1996

UNEP/OzL.Pro/ExCom/20/65            Safety related costs in projects using hydrocarbon technology

                                                                        Date: 24 September 1996

UNEP/OzL.Pro/ExCom/20/66            Capital and operating costs in the halon fire extinguisher sub-sector

                                                                        Date: 13 September 1996

UNEP/OzL.Pro/ExCom/20/67            Study on low pressure versus high pressure foaming machines

                                                                        Date: 24 September 1996

UNEP/OzL.Pro/ExCom/20/68, Rev.1  Report on implementation of the Philippines household

                                                                        Date: 26 September 1996

UNEP/OzL.Pro/ExCom/20/69            The application of hydrochlorofluorocarbons (HCFCs) in projects funded by the Multilateral Fund

                                                                        Date: 7 September 1996

UNEP/OzL.Pro/ExCom/20/70            Report on the work currently in progress on alternatives to methyl bromide

                                                                        Date: 24 September 1996

UNEP/OzL.Pro/ExCom/20/71            Study on technology transfer

                                                                        Date: 21 September 1996

UNEP/OzL.Pro/ExCom/20/72            Report of the Twentieth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 18 October 1996

UNEP/OzL.Pro/ExCom/20/72, Annex VI         Interim Guidelines on Methyl Bromide Projects

                                                                        Date: 18 October 1996

UNEP/OzL.Pro/ExCom/21/4              Administrative costs of the Implementing Agencies

                                                                        Date: 18 January 1997

UNEP/OzL.Pro/ExCom/21/5              Financial planning and projections of cash flow for the triennium 1997-1999

                                                                        Date: 20 January 1997

UNEP/OzL.Pro/ExCom/21/6              Three-year (1997-1999) business plan of the Multilateral Fund

                                                                        Date: 19 January 1997

UNEP/OzL.Pro/ExCom/21/7              Overview of the 1997 business plans of the Implementing Agencies

                                                                        Date: 20 January 1997

UNEP/OzL.Pro/ExCom/21/8              1997 UNDP business plan

                                                                        Date: 21 January 1997

UNEP/OzL.Pro/ExCom/21/9              1997 UNEP business plan

                                                                        Date: 22 January 1997

UNEP/OzL.Pro/ExCom/21/10            1997 UNIDO business plan

                                                                        Date: 21 January 1997

UNEP/OzL.Pro/ExCom/21/11            1997 World Bank business plan

                                                                        Date: 21 January 1997

UNEP/OzL.Pro/ExCom/21/12            Report of the Sub-Committee on Project Review

                                                                        Date: 18 February 1997

UNEP/OzL.Pro/ExCom/21/24            China’s halon sector strategy

                                                                        Date: 17 January 1997

UNEP/OzL.Pro/ExCom/21/29            Report of the Executive Committee’s Sub-Group on the Production Sector

                                                                        Date: 18 February 1997

UNEP/OzL.Pro/ExCom/21/30            Monitoring and evaluation system for the Multilateral Fund (revised draft from the consultant)

                                                                        Date: 17 January 1997

UNEP/OzL.Pro/ExCom/21/31            Retroactive funding

                                                                        Date: 20 January 1997

UNEP/OzL.Pro/ExCom/21/32            Technology transfer

                                                                        Date: 18 January 1997

UNEP/OzL.Pro/ExCom/21/33            Report on actions to improve the functioning of the Financial Mechanism, Decision VIII/5)

                                                                        Date: 18 January 1997

UNEP/OzL.Pro/ExCom/21/34            Concessional lending

                                                                        Date: 21 January 1997

UNEP/OzL.Pro/ExCom/21/35            Discussion paper for the establishment of training guidelines for identification of needs and coordination of activities (submitted by UNEP IE)

                                                                        Date: 18 January 1997

UNEP/OzL.Pro/ExCom/21/36            Report of the Twenty-first Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 20 February 1997

UNEP/OzL.Pro/ExCom/21/36, Annex VI         Initial Guidance to Allow Further Development by China and the World Bank of the Halon Sector Approach Pilot Programme Under and Umbrella Agreement

                                                                        Date: 20 February 1997

UNEP/OzL.Pro/ExCom/21/36, Annex VII        Terms of Reference of the Monitoring, Evaluation, and Finance Sub-Committee

                                                                        Date: 20 February 1997

UNEP/OzL.Pro/ExCom/22/5              Report of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 29 May 1997

UNEP/OzL.Pro/ExCom/22/6              Evaluation of 1996 business plans of the Implementing Agencies

                                                                        Date: 25 April 1997

UNEP/OzL.Pro/ExCom/22/7              Consolidated revised 1997 business plans of the Implementing Agencies

                                                                        Date: 28 April 1997

UNEP/OzL.Pro/ExCom/22/8              UNDP revised 1997 business plan

                                                                        Date: 29Apr 1997

UNEP/OzL.Pro/ExCom/22/9              UNEP revised 1997 business plan

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/10            UNIDO revised 1997 business plan

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/11            World Bank revised 1997 business plan

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/12            Three year (1997-1999) business plan of the Multilateral Fund

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/13            Summary status report on ODS phase-out for Article 5 countries

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/14            Indicators for the evaluation of the performance of the Implementing Agencies

                                                                        Date: 25 April 1997

UNEP/OzL.Pro/ExCom/22/15            Report of the Sub-Committee on Project Review

                                                                        Date: 28 May 1997

UNEP/OzL.Pro/ExCom/22/16            Overview of issues identified during project review

                                                                        Date: 4 May 1997

UNEP/OzL.Pro/ExCom/22/68            Report of the Executive Committee’s Subgroup on the Production Sector

                                                                        Date: 27 May 1997

UNEP/OzL.Pro/ExCom/22/69            Report on options to advance phase-out in the SME sector

                                                                        Date: 27 April 1997

UNEP/OzL.Pro/ExCom/22/70            Progress of implementation of country programmes: Implications of using different baseline years

                                                                        Date: 30 April 1997

UNEP/OzL.Pro/ExCom/22/71            Discrepancy between data reported to the Ozone and Fund Secretariats: Reconciliation and harmonization of the two parallel streams of data reporting

                                                                        Date: 1 May 1997

UNEP/OzL.Pro/ExCom/22/72            Draft guidelines for proposals to change technology in approved projects

                                                                        Date: 25 April 1997

UNEP/OzL.Pro/ExCom/22/73            Incremental operating costs for domestic refrigeration compressors

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/74            Training guidelines for identification of needs and coordination of activities

                                                                        Date: 3 May 1997

UNEP/OzL.Pro/ExCom/22/76            Actions to improve the functioning of the Financial Mechanism (Decision VIII/5)

                                                                        Date: 29 April 1997

UNEP/OzL.Pro/ExCom/22/77            Sector plan for phase-out in China

                                                                        Date: 28 April 1997

UNEP/OzL.Pro/ExCom/22/79/Rev.1   Report of the Twenty-second Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 30 June 1997

UNEP/OzL.Pro/ExCom/22/79/Rev.1, Annex III           Work programme and work plan on monitoring and evaluation of the Multilateral Fund for a twelve-month period between 1997-1998

                                                                        Date: 30 June 1997

UNEP/OzL.Pro/ExCom/22/79/Rev.1, Annex VII          Progress of implementation of country programmes

                                                                        Date: 30 June 1997

UNEP/OzL.Pro/ExCom/23/4              Report of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 16 October 1997

UNEP/OzL.Pro/ExCom/23/4/Add.1     Report of the Third Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 12 November 1997

UNEP/OzL.Pro/ExCom/23/5              Project implementation delays

                                                                        Date: 20 October 1997

UNEP/OzL.Pro/ExCom/23/6              Standard components on monitoring and evaluation in project proposals

                                                                        Date: 17 October 1997

UNEP/OzL.Pro/ExCom/23/7              Format of project completion reports

                                                                        Date: 19 October 1997

UNEP/OzL.Pro/ExCom/23/10 and Add.1         Reports of the Sub-Committee on Project Review

                                                                        Date: 1 October 1997, 12 November 1997 (Add.1)

UNEP/OzL.Pro/ExCom/23/11            China’s halon sector strategy

                                                                        Date: 21 October 1997

UNEP/OzL.Pro/ExCom/23/17/Rev.1 and Add.1            Overview of issues identified during project review

                                                                        Date: 3 November 1997

UNEP/OzL.Pro/ExCom/23/52            Guidelines for the preparation of Refrigerant Management Plan (RMP)

                                                                        Date: 17 October 1997

UNEP/OzL.Pro/ExCom/23/53            Baseline equipment

                                                                        Date: 16 October 1997

UNEP/OzL.Pro/ExCom/23/54            Safety related costs of hydrocarbon technologies

                                                                        Date: 18 October 1997

UNEP/OzL.Pro/ExCom/23/55            Draft guidelines for cost-effectiveness thresholds in the tobacco sector

                                                                        Date: 19 October 1997

UNEP/OzL.Pro/ExCom/23/61            Issues remaining from Twenty-second Meeting

                                                                        Date: 20 October 1997

UNEP/OzL.Pro/ExCom/23/62            Report of the Executive Committee’s Subgroup on the Production Sector

                                                                        Date: 18 September 1997

UNEP/OzL.Pro/ExCom/23/63            Criteria for project preparation

                                                                        Date: 30 September 1997

UNEP/OzL.Pro/ExCom/23/64            Prices of chemicals

                                                                        Date: 15 October 1997

UNEP/OzL.Pro/ExCom/23/66            Draft guideline for liquid carbon dioxide technology in foam projects

                                                                        Date: 7 November 1997

UNEP/OzL.Pro/ExCom/23/Inf.3         Guidelines for Liquid Carbon Dioxide projects (Submitted by UNDP)

                                                                        Date: 22 September 1997

UNEP/OzL.Pro/ExCom/23/Inf.4         Training Guidelines for Identification of Needs and Coordination of Activities (Submitted by UNEP IE)

                                                                        Date: 13 November 1997

UNEP/OzL.Pro/ExCom/23/68            Report of the Twenty-third Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 15 November 1997

UNEP/OzL.Pro/ExCom/23/68, Annex II          Evaluation Guide

                                                                        Date: 15 November 1997

UNEP/OzL.Pro/ExCom/23/68, Annex III         Format for project completion reports (investment projects)

                                                                        Date: 30 June 1997

UNEP/OzL.Pro/ExCom/24/4              Report of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 24 March 1998

UNEP/OzL.Pro/ExCom/24/11            Project implementation delays

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/12            Non-investment project milestones

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/13            Format for project completion report (non-investment project) (Revised Draft)

                                                                        Date: 24 February 1998

UNEP/OzL.Pro/ExCom/24/14            Status of preparation of investment project completion reports

                                                                        Date: 24 February 1998

UNEP/OzL.Pro/ExCom/24/15            Co-financing

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/16            Status of recruitment of Monitoring and Evaluation Officer

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/17            Report of the Sub-Committee on Project Review

                                                                        Date: 25 March 1998

UNEP/OzL.Pro/ExCom/24/18            Strategy and guidelines for investment projects in the methyl bromide sector

                                                                        Date: 25 February 1998

UNEP/OzL/Pro/ExCom/24/19 and Corr.1        Overview of issues identified during project review

                                                                        Date: 27 February 1998

UNEP/OzL.Pro/ExCom/24/38 and Corr.1        Safety related costs of hydrocarbon technology

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/39            Draft guidelines for liquid carbon dioxide technology in foam projects

                                                                        Date: 27 February 1998

UNEP/OzL.Pro/ExCom/24/43            Report of the Executive Committee’s Subgroup on the Production Sector

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/44            Analysis of use of HCFC technologies in Fund-assisted projects

                                                                        Date: 25 February 1998

UNEP/OzL.Pro/ExCom/24/47            Report of the Twenty-fourth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 27 March 1998

UNEP/OzL.Pro/ExCom/24/47, Annex II          Non-investment project milestones

                                                                        Date: 27 March 1998

UNEP/OzL.Pro/ExCom/24/47, Annex III         Format for project completion report (non-investment projects)

                                                                        Date: 27 March 1998

UNEP/OzL.Pro/ExCom/24/47, Annex IV         Strategy and guidelines for projects in the methyl bromide sector

                                                                        Date: 27 March 1998

UNEP/OzL.Pro/ExCom/24/47, Annex VI         Guidelines for liquid carbon dioxide projects

                                                                        Date: 27 March 1998

UNEP/OzL.Pro/ExCom/25/4              Report of the Fifth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 28 July 1998

UNEP/OzL.Pro/ExCom/25/6 and Corr.1          Promissory notes

                                                                        Date: 14 July 1998

UNEP/OzL.Pro/ExCom/25/7              Project implementation delays: Bankruptcy

                                                                        Date: 25 June 1998

UNEP/OzL.Pro/ExCom/25/8              Evaluation of 1997 business plans

                                                                        Date: 20 June 1998

UNEP/OzL.Pro/ExCom/25/9              Consolidated progress report

                                                                        Date: 18 June 1998

UNEP/OzL.Pro/ExCom/25/15            Consolidated project completion report

                                                                        Date: 27 June 1998

UNEP/OzL.Pro/ExCom/25/16 and Rev.1         Summary status report on ODS phase-out in Article 5 countries

                                                                        Date: 16 July 1998

UNEP/OzL.Pro/ExCom/25/17            Report of the Fourteenth Meeting of the Sub-Committee on Project Review

                                                                        Date: 29 July 1998

UNEP/OzL.Pro/ExCom/25/18 and Corr.1        Overview of issues identified during project review

                                                                        Date: 2 July 1998

UNEP/OzL.Pro/ExCom/25/54            Hydrocarbon safety

                                                                        Date: 25 June 1998

UNEP/OzL.Pro/ExCom/25/55            Baseline equipment

                                                                        Date: 23 June 1998

UNEP/OzL.Pro/ExCom/25/56            Incremental operating costs for compressors

                                                                        Date: 27 June 1998

UNEP/OzL.Pro/ExCom/25/57            Terminal umbrella projects

                                                                        Date: 26 June 1998

UNEP/OzL.Pro/ExCom/25/58 and Corr.1        Retrofit of commercial refrigeration equipment

                                                                        Date: 20 July 1998

UNEP/OzL.Pro/ExCom/25/65            Concessional lending

                                                                        Date: 20 June 1998

UNEP/OzL.Pro/ExCom/25/66 and Add.1         Administrative costs of the Implementing Agencies

                                                                        Date: 30 June 1998

UNEP/OzL.Pro/ExCom/25/67            Report of the production sector subgroup

                                                                        Date: 27 July 1998

UNEP/OzL.Pro/ExCom/25/Inf.2         Host government agreement

                                                                        Date: 2 July 1998

UNEP/OzL.Pro/ExCom/25/68            Report of the Twenty-fifth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 31 July 1998

UNEP/OzL.Pro/ExCom/25/68, Annex II          Amendments to the Agreement between the Executive Committee of the (then Interim) Multilateral Fund for the Implementation of the Montreal Protocol and the United Nations Development Programme, signed on 21 August 1991 and the United Nations Industrial Development Organization, signed on 22 October 1992

                                                                        Date: 27 March 1998

UNEP/OzL.Pro/ExCom/26/4              Report of the Sixth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 11 November 1998

UNEP/OzL.Pro/ExCom/26/5              Project implementation delays

                                                                        Date: 9 October 1998

UNEP/OzL.Pro/ExCom/26/6              Performance indicators for the evaluation of business plans

                                                                        Date: 28 October 1998

UNEP/OzL.Pro/ExCom/26/7              Summary table on the status of ODS phase-out in Article 5 countries

                                                                        Date:12 October 1998

UNEP/OzL.Pro/ExCom/26/13            Status of implementation of the monitoring and evaluation work programme

                                                                        Date: 8 October 1998

UNEP/OzL.Pro/ExCom/26/15            Proposed Budget of the Fund Secretariat for 1999

                                                                        Date: 14 October 1998

UNEP/OzL.Pro/ExCom/26/16            Report of the Fifteenth Meeting of the Sub-Committee on Project Review

                                                                        Date: 12 November 1998

UNEP/OzL.Pro/ExCom/26/17 and Cor.1         Overview of issues identified during project review

                                                                        Date: 16 October 1998

UNEP/OzL.Pro/ExCom/26/58            Incremental operating costs for compressors

                                                                        Date: 11 October 1998

UNEP/OzL.Pro/ExCom/26/59            Baseline equipment

                                                                        Date: 11 October 1998

UNEP/OzL.Pro/ExCom/26/60            Retrofit of commercial refrigeration equipment

                                                                        Date: 12 October 1998

UNEP/OzL.Pro/ExCom/26/66            Report of the Executive Committee’s Subgroup on Production Sector

                                                                        Date: 12 November 1998

UNEP/OzL.Pro/ExCom/26/67            Administrative costs of the Implementing Agencies

                                                                        Date: 14 October 1998

UNEP/OzL.Pro/ExCom/26/70            Report of the Twenty-sixth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 13 November 1998

UNEP/OzL.Pro/ExCom/27/4              Report of the Seventh Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

      Date: 24 March 1999

UNEP/OzL.Pro/ExCom/27/5 and Corr.1          Consolidated 1999 business plan of the Multilateral Fund

                                                                        Date: 16 February 1999

UNEP/OzL.Pro/ExCom/27/6              1999 business plans for bilateral co-operation

                                                                        Date: 16 February 1999

UNEP/OzL.Pro/ExCom/27/7 and Corr.1          1999 business plans of UNDP

                                                                        Date: 16 February 1999

UNEP/OzL.Pro/ExCom/27/8 and Corr.1          1999 business plans of UNEP

                                                                        Date: 16 February 1999

UNEP/OzL.Pro/ExCom/27/9 and Corr.1          1999 business plans of UNIDO

                                                                        Date: 16 February 1999

UNEP/OzL.Pro/ExCom/27/10            1999 business plans of World Bank

                                                                        Date: 16 February 1999

UNEP/OzL.Pro/ExCom/27/11 and Corr.1        Project implementation delays

                                                                        Date: 16 March 1999

UNEP/OzL.Pro/ExCom/27/12            Draft monitoring and evaluation work programme for 1999

                                                                        Date: 18 February 1999

UNEP/OzL.Pro/ExCom/27/13            Report of the Sixteenth Meeting of the Sub-Committee on Project Review

                                                                        Date: 24 March 1999

UNEP/OzL.Pro/ExCom/27/14 and Corr.1        Overview of issues identified during project review

                                                                        Date: 24 February 1999

UNEP/OzL.Pro/ExCom/27/37            Possible consideration of a new sub-sector for transportation refrigeration

                                                                        Date: 22 February 1999

UNEP/OzL.Pro/ExCom/27/38            Eligibility of ODS consumption arising from evaporation losses in the foam industry

                                                                        Date: 21 February 1999

UNEP/OzL.Pro/ExCom/27/39            Circumstances for the consideration of ODS phase out in the commercial refrigeration end-user sector

                                                                        Date: 22 February 1999

UNEP/OzL.Pro/ExCom/27/40            Process agents: implementation of Decision X/14 (paragraphs 3, 5, and 6) of the Tenth Meeting of the Parties

                                                                        Date: 18 February 1999

UNEP/OzL.Pro/ExCom/27/41            Phase-out plan for the solvent sector in China

                                                                        Date: 20 February 1999

UNEP/OzL.Pro/ExCom/27/45, Corr.1, Add.1   Production sector

                                                                        Date: 20 February 1999

UNEP/OzL.Pro/ExCom/27/46            Export to non-Article 5 countries: guidelines for project eligibility

                                                                        Date: 21 February 1999

UNEP/OzL.Pro/ExCom/27/47            Concessional loans

                                                                        Date: 23 February 1999

UNEP/OzL.Pro/ExCom/27/48, Corr.1, Corr.2  Report of the Twenty-seventh Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 26 March 1999

UNEP/OzL.Pro/ExCom/27/48, Annex III         Framework Guidelines/Broad Principles for Process Agent Projects

                                                                        Date: 26 March 1999

UNEP/OzL.Pro/ExCom/27/48, Annex IV         Agreement for the China Production Sector

                                                                        Date: 26 March 1999

UNEP/OzL.Pro/ExCom/28/4              Report of the Eighth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 14 July 1999

UNEP/OzL.Pro/ExCom/28/5              Consolidated progress report

                                                                        Date: 15 June 1999

UNEP/OzL.Pro/ExCom/28/11            Consequences of project cancellations

                                                                        Date: 15 June 1999

UNEP/OzL.Pro/ExCom/28/12            Evaluation of 1998 business plans

                                                                        Date: 16 June 1999

UNEP/OzL.Pro/ExCom/28/13            Shares of the Implementing Agencies

                                                                        Date: 11 June 1999

UNEP/OzL.Pro/ExCom/28/14            Summary status report on ODS phase-out in Article 5 countries (1999 update)

                                                                        Date: 16 June 1999

UNEP/OzL.Pro/ExCom/28/16            Interim report on the implementation of the 1999 work programme for monitoring and evaluation

                                                                        Date: 11 June 1999

UNEP/OzL.Pro/ExCom/28/18            Report of the Seventeenth Meeting of the Sub-Committee on Project Review

                                                                        Date: 13 July 1999

UNEP/OzL.Pro/ExCom/28/19/Rev.1   Overview of issues identified during project review

                                                                        Date: 10 July 1999

UNEP/OzL.Pro/ExCom/28/47            Circumstances for the consideration of ODS phase-out in the commercial refrigeration end-user sector: additional considerations

                                                                        Date: 16 June 1999

UNEP/OzL.Pro/ExCom/28/48            The sterilants sector

                                                                        Date: 11 June 1999

UNEP/OzL.Pro/ExCom/28/49            Strategy plan of ODS phase-out from production of extruded polyethylene and polystyrene foams sub sectors of China

                                                                        Date: 15 June 1999

UNEP/OzL.Pro/ExCom/28/50 and Corr.1        India halon phase-out strategy

                                                                        Date: 13 June 1999

UNEP/OzL.Pro/ExCom/28/52 and Corr.1        Revision of the guidelines for the methyl bromide sector

                                                                        Date: 22 June 1999

UNEP/OzL.Pro/ExCom/28/53            Report on concessional lending (a discussion paper by the Secretariat)

                                                                        Date: 11 June 1999

UNEP/OzL.Pro/ExCom/28/54 and Add.1         Report on implementation of the new administrative cost regime

                                                                        Date: 12 June 1999

UNEP/OzL.Pro/ExCom/28/55            Export to non-article 5 countries: Report on project eligibility

                                                                        Date: 11 June 1999

UNEP/OzL.Pro/ExCom/28/Inf.2         Production of domestic refrigerators, freezers and hermetic compressors (submitted by the Government of China as per Decision 27/16)

                                                                        Date: 11 June 1999

UNEP/OzL.Pro/ExCom/28/Inf.3         Discussion paper submitted by the Government of Sweden on policy on HCFCs

                                                                        Date: 14 June 1999

UNEP/OzL.Pro/ExCom/28/Inf.4         Concessional lending under the Multilateral Fund (a discussion paper from the Swedish Delegation)

                                                                        Date: 23 June 1999

UNEP/OzL.Pro/ExCom/28/Inf.5         Conclusions of the meeting of the informal group on technology transfer

                                                                        Date: 8 July 1999

UNEP/OzL.Pro/ExCom/28/57            Report of the Twenty-eighth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 16 July 1999

UNEP/OzL.Pro/ExCom/29/4              Report of the Ninth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 24 November 1999

UNEP/OzL.Pro/ExCom/29/5, Add.1, Corr.1    Report on the implementation of the 1999 work programme for monitoring and evaluation

                                                                        Date: 29 October 1999

UNEP/OzL.Pro/ExCom/29/6              Draft work programme for monitoring and evaluation for the year 2000

                                                                        Date:29 October 1999

UNEP/OzL.Pro/ExCom/29/7, Corr.1   Project implementation delays

                                                                        Date: 24 October 1999

UNEP/OzL.Pro/ExCom/29/8              Consequences of project cancellation

                                                                        Date: 23 October 1999

UNEP/OzL.Pro/ExCom/29/9              Completed projects with balances

                                                                        Date: 24 October 1999

UNEP/OzL.Pro/ExCom/29/10            Status report on ODS phase-out in Article 5 countries: Implementation of Decision 28/25

                                                                        Date: 25 October 1999

UNEP/OzL.Pro/ExCom/29/11            Consolidated draft business plan of the Multilateral Fund for the year 2000

                                                                        Date: 28 October 1999

UNEP/OzL.Pro/ExCom/29/12            Draft business plan for the year 2000 of UNDP

                                                                        Date: 27 October 1999

UNEP/OzL.Pro/ExCom/29/13            Draft business plan for the year 2000 of UNEP

                                                                        Date: 26 October 1999

UNEP/OzL.Pro/ExCom/29/14            Draft business plan for the year 2000 of UNIDO

                                                                        Date: 28 October 1999

UNEP/OzL.Pro/ExCom/29/15            Draft business plan for the year 2000 of World Bank

                                                                        Date: 27 October 1999

UNEP/OzL.Pro/ExCom/29/16            Proposed budget of the Fund Secretariat for the year 2000

                                                                        Date: 26 October 1999

UNEP/OzL.Pro/ExCom/29/17            Report of the Eighteenth Meeting of the Sub-Committee on Project Review

                                                                        Date: 22 November 1999

UNEP/OzL.Pro/ExCom/29/18, Corr.1 Overview of issues identified during project review

                                                                        Date: 1 November 1999

UNEP/OzL.Pro/ExCom/29/55            Revision of guidelines for the methyl bromide sector

                                                                        Date: 31 October 1999

UNEP/OzL.Pro/ExCom/29/57            Report of the Executive Committee’s subgroup on the production sector

                                                                        Date: 29 October 1999

UNEP/OzL.Pro/ExCom/29/58            Report of the contact group on refrigerant management plans

                                                                        Date: 29 October 1999

UNEP/OzL.Pro/ExCom/29/59            Concessional lending

                                                                        Date: 29 October 1999

UNEP/OzL.Pro/ExCom/29/60            Report on the implementation of the new administrative cost regime

                                                                        Date: 21 October 1999

UNEP/OzL.Pro/ExCom/29/61            Report of the Chair of the working group on the phase-out plan for the solvent sector in China

                                                                        Date: 29 October 1999

UNEP/OzL.Pro/ExCom/29/65            Report of the Twenty-ninth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 26 November 1999

UNEP/OzL.Pro/ExCom/29/65, Annex II          Schedules of submissions of backlogged project completion reports

                                                                        Date: 26 November 1999

UNEP/OzL.Pro/ExCom/29/65, Annex V          Agreed conditions for phase out of methyl bromide in Jordan

                                                                        Date: 26 November 1999

UNEP/OzL.Pro/ExCom/29/65, Annex VI         Consensus Agreement for the Indian Production Sector (1 October 1999)

                                                                        Date: 26 November 1999

UNEP/OzL.Pro/ExCom/30/4              Report of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 28 March 2000

UNEP/OzL.Pro/ExCom/30/5              Final report on the 1999 evaluation of refrigeration projects and draft follow-up action plan

                                                                        Date: 23 February 2000

UNEP/OzL.Pro/ExCom/30/6 and Corr. 1         Final report on the 1999 evaluation of institutional strengthening projects and draft follow-up action plan

                                                                        Date: 23 February 2000

UNEP/OzL.Pro/ExCom/30/7              Report of the workshop on project completion report formats

                                                                        Date: 28 February 2000

UNEP/OzL.Pro/ExCom/30/8              Desk study on evaluation of regional networks (2000 monitoring and evaluation work programme)

                                                                        Date: 28 February 2000

UNEP/OzL.Pro/ExCom/30/9              The possibility of a desk study on recovery and recycling projects

                                                                        Date: 23 February 2000

UNEP/OzL.Pro/ExCom/30/10 and Corr.1        Consolidated 2000 business plan of the Multilateral Fund

                                                                        Date: 13 March 2000

UNEP/OzL.Pro/ExCom/30/16            Project implementation delays

                                                                        Date: 22 February 2000

UNEP/OzL.Pro/ExCom/30/17            Completed projects with balances, follow-up on Decision 29/9

                                                                        Date: 23 February 2000

UNEP/OzL.Pro/ExCom/30/18            Financial intermediaries/administrative costs, follow-up on Decision 29/73

                                                                        Date: 22 February 2000

UNEP/OzL.Pro/ExCom/30/19            Sectoral ODS consumption data: consolidated report based on preliminary reports from Implementing Agencies (Decisions 28/25 and 29/10)

                                                                        Date: 1 March 2000

UNEP/OzL.Pro/ExCom/30/20            Report of the Sub-Committee on Project Review

                                                                        Date: 29 March 2000

UNEP/OzL.Pro/ExCom/30/21/Rev.1   Overview of issues identified during project review

                                                                        Date: 24 March 2000

UNEP/OzL.Pro/ExCom/30/34            Phase-out strategy for the solvent sector in China

                                                                        Date: 26 February 2000

UNEP/OzL.Pro/ExCom/30/35            Strategic planning and the draft three-year business plan for the Multilateral Fund for 2000-2002

                                                                        Date: 26 February 2000

UNEP/OzL.Pro/ExCom/30/38            The Executive Committee’s Subgroup on Production Sector

                                                                        Date: 27 February 2000

UNEP/OzL.Pro/ExCom/30/41            Report of the Thirtieth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 31 March 2000

UNEP/OzL.Pro/ExCom/30/41, Annex III         Agreed Conditions for Funding Methyl Bromide Phase out Project in Argentina

                                                                        Date: 31 March 2000

UNEP/OzL.Pro/ExCom/30/41, Annex IV         Agreement for ODS Phase out in China’s Solvent Sector

                                                                        Date: 31 March 2000

UNEP/OzL.Pro/ExCom/31/4              Report of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 5 July 2000

UNEP/OzL.Pro/ExCom/31/6              Completed projects with balances: follow-up to Decision 30/19

                                                                        Date: 25 May 2000

UNEP/OzL.Pro/ExCom/31/7              Implementation delays: follow-up to Decisions 30/10 and 30/11

                                                                        Date: 1 June 2000

UNEP/OzL.Pro/ExCom/31/8              Consolidated progress report as at 31 December 1999

                                                                        Date: 30 May 2000

UNEP/OzL.Pro/ExCom/31/9              Progress report of bilateral co-operation as at 31 December 1999

                                                                        Date: 30 May 2000

UNEP/OzL.Pro/ExCom/31/14 and Corr.1        Evaluation of the implementation of the 1999 business plans

                                                                        Date: 6 June 2000

UNEP/OzL.Pro/ExCom/31/15            ODS sector consumption data: follow-up on Decision 30/20

                                                                        Date: 4 June 2000

UNEP/OzL.Pro/ExCom/31/16            Institutional strengthening projects: follow-up to Decision 30/7 (f) and (g)

                                                                        Date: 2 June 2000

UNEP/OzL.Pro/ExCom/31/17 and Corr.1        Desk study on compressor projects

                                                                        Date: 7 June 2000

UNEP/OzL.Pro/ExCom/31/18            Desk study on recovery and recycling projects

                                                                        Date: 7 June 2000

UNEP/OzL.Pro/ExCom/31/19            Draft format for institutional strengthening terminal reports and extension requests: follow-up to Decision 30/8 (e) and (f)

                                                                        Date: 2 June 2000

UNEP/OzL.Pro/ExCom/31/20            Report on evaluation of training projects

                                                                        Date: 8 June 2000

UNEP/OzL.Pro/ExCom/31/21            Report of the Sub-Committee on Project Review

                                                                        Date: 5 July 2000

UNEP/OzL.Pro/ExCom/31/22            Overview of issues identified during project review

                                                                        Date: 9 June 2000

UNEP/OzL.Pro/ExCom/31/52            Historical data on relevant decisions and methodologies used to establish incremental operating costs or savings arising from the replacement of CFCs by substitute chemicals in projects funded by the multilateral Fund

                                                                        Date: 20 June 2000

UNEP/OzL.Pro/ExCom/31/53            Technical study on foam density

                                                                        Date: 27 June 2000

UNEP/OzL.Pro/ExCom/31/54            New sub-sector for the assembly, installation and servicing of refrigeration equipment: status report

                                                                        Date: 20 June 2000

UNEP/OzL.Pro/ExCom/31/55            Strategic planning and the draft three-year business plan for the Multilateral Fund for 2000-2002

                                                                        Date: 4 June 2000

UNEP/OzL.Pro/ExCom/31/56            Report of the Subgroup on the Production Sector

                                                                        Date: 6 July 2000

UNEP/OzL.Pro/ExCom/31/57            Refrigerant management plans (RMP)

                                                                        Date: 6 June 2000

UNEP/OzL.Pro/ExCom/31/58            Revised guidelines for methyl bromide projects

                                                                        Date: 29 June 2000

UNEP/OzL.Pro/ExCom/31/59            Terms of reference for a study on CFC alternatives in rigid foams

                                                                        Date: June 2000

UNEP/OzL.Pro/ExCom/31/61            Report of the Thirty-first Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex III         Terminal report for institutional strengthening projects

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex IV         Extension of institutional strengthening projects. revised plan of action

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex VII        Conclusions and recommendations of the World Bank OORG foam density report 2000

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex VIII      Agreed conditions for funding methyl bromide phase-out project in Turkey

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex IX         Agreed conditions for funding methyl bromide phase-out project in Zimbabwe

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex X          Guidelines for definition of the sub-sector for assembly, installation and charging of refrigeration equipment and the calculation of incremental operating costs

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/31/61, Annex XI         Terms of reference for a study on alternatives to CFC in rigid foam applications

                                                                        Date: 7 July 2000

UNEP/OzL.Pro/ExCom/32/3              Report of the Twelfth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 6 December 2000

UNEP/OzL.Pro/ExCom/32/5              Status report on the implementation of the fixed exchange-rate mechanism

                                                                        Date: 3 November 2000

UNEP/OzL.Pro/ExCom/32/6              Completed projects with balances

                                                                        Date: 6 November 2000

UNEP/OzL.Pro/ExCom/32/9              Additional status report on project implementation required by decisions 31/6 (c) and 31/7 (e) and (f)

                                                                        Date: 8 November 2000

UNEP/OzL.Pro/ExCom/32/10            Report on the evaluation of the implementation of the 1999 business plans: follow-up to decision 31/11

                                                                        Date: 26 October 2000

UNEP/OzL.Pro/ExCom/32/18            General principles for agreements between governments and Implementing Agencies on new and renewed institutional strengthening projects (decision 30/7 (c))

                                                                        Date: 7 November 2000

UNEP/OzL.Pro/ExCom/32/19, Corr.1, Add.1   Report on the implementation of the monitoring and evaluation work programme for the year 2000

                                                                        Date: 9 November 2000

UNEP/OzL.Pro/ExCom/32/20, Corr.1 Draft work programme for monitoring and evaluation for the year 2001

                                                                        Date: 26 October 2000

UNEP/OzL.Pro/ExCom/32/21            Report of the Twenty-First Meeting of the Sub-Committee on Project Review

                                                                        Date: 7 December 2000

UNEP/OzL.Pro/ExCom/32/22, Corr.1 Overview of issues identified during project review

                                                                        Date: 10 November 2000

UNEP/OzL.Pro/ExCom/32/31            Draft guidelines for preparation of country programme updates

                                                                        Date: 8 November 2000

UNEP/OzL.Pro/ExCom/32/32            Draft agreement on the phase-out strategy for the tobacco sector in China: follow-up to decision 30/54

                                                                        Date: 8 November 2000

UNEP/OzL.Pro/ExCom/32/33            Draft guidelines and standard format for verification of ODS production phase-out

                                                                        Date: 24 October 2000

UNEP/OzL.Pro/ExCom/32/38            Strategic planning and the draft three-year business plan for the Multilateral Fund

                                                                        Date: 8 November 2000

UNEP/OzL.Pro/ExCom/32/39            The Executive Committee’s Subgroup on Production Sector

                                                                        Date: 8 November 2000

UNEP/OzL.Pro/ExCom/32/40, Corr.1 Revised guidelines for methyl bromide projects (Draft)

                                                                        Date: 29 October 2000

UNEP/OzL.Pro/ExCom/32/44, Corr.1 Report of the Thirty-second Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex V          Criteria and rating scheme for overall assessment

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex VI         Schedule for submission of outstanding project completion reports (PCRs) in 2001

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex VII        Recommendations from training programmes

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex IX         Agreed conditions for funding methyl bromide phase-out project in Chile

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex X          Agreed conditions for funding methyl bromide phase-out project in Macedonia

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex XI         Agreed conditions for funding methyl bromide phase-out project in Malawi

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex XII       Agreed conditions for funding methyl bromide phase-out project in Morocco

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex XIII      Agreement between the Government of China and the Executive Committee on the phase out strategy for the tobacco sector (Sector Plan) in China

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/32/44, Annex XIV      Revised strategy and guidelines for projects in the methyl bromide sector

                                                                        Date: 8 December 2000

UNEP/OzL.Pro/ExCom/33/3              Report of the Thirteenth Meeting on Monitoring, Evaluation and Finance

                                                                        Date: 27 March 2001

UNEP/OzL.Pro/ExCom/33/6              Final report on the evaluation of foam projects

                                                                        Date: 1 March 2001

UNEP/OzL.Pro/ExCom/33/7, Corr.1   Final report on the evaluation of regional networks

                                                                        Date: 26 February 2001

UNEP/OzL.Pro/ExCom/33/8, Corr.1   Consolidated 2001 business plan of the Multilateral Fund

                                                                        Date: 24 February 2001

UNEP/OzL.Pro/ExCom/33/14, Corr.1, Rev.1   Project implementation delays

                                                                        Date: 22 February 2001

UNEP/OzL.Pro/ExCom/33/15, Add.1  Completed projects with balances

                                                                        Date: 22 February 2001

UNEP/OzL.Pro/ExCom/33/16            General principles for agreements between Governments and Implementing Agencies on new and renewed institutional strengthening projects (follow-up to Decision 32/15)

                                                                        Date: 23 February 2001

UNEP/OzL.Pro/ExCom/33/17            Report of the Twenty-second Meeting of the Sub-Committee on Project Review

                                                                        Date: 27 March 2001

UNEP/OzL.Pro/ExCom/33/18            Overview of issues identified during project review

                                                                        Date: 1 March 2001

UNEP/OzL.Pro/ExCom/33/25            Pre-requisites for terminal phase-out in the refrigeration sector

                                                                        Date: 27 February 2001

UNEP/OzL.Pro/ExCom/33/27            Strategic framework for national sub-regional and regional customs training

                                                                        Date: 27 February 2001

UNEP/OzL.Pro/ExCom/33/29, Add.1  Draft guidelines for the preparation of country programme updates

                                                                        Date: 24 February 2001

UNEP/OzL.Pro/ExCom/33/30            Strategic planning (follow-up to Decision 32/75)

                                                                        Date: 28 February 2001

UNEP/OzL.Pro/ExCom/33/31            Status report on the study on alternatives to CFC in rigid foam applications

                                                                        Date: 28 February 2001

UNEP/OzL.Pro/ExCom/33/32            Report of the Thirty-third Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 30 March 2001

UNEP/OzL.Pro/ExCom/33/32, Annex VII        Draft prerequisites and guidelines for terminal phase-out in the refrigeration sector

                                                                        Date: 30 March 2001

UNEP/OzL.Pro/ExCom/33/32, Annex VIII      Framework on the objectives, priorities, problems and modalities for strategic planning of the Multilateral Fund in the compliance period

                                                                        Date: 30 March 2001

UNEP/OzL.Pro/ExCom/34/4              Report of the Fourteenth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 17 July 2001

UNEP/OzL.Pro/ExCom/34/5              Status report on the implementation of the fixed exchange mechanism (follow-up to Decision 32/2)

                                                                        Date: 18 June 2001

UNEP/OzL.Pro/ExCom/34/7 and Corr.1          Completed projects with balances

                                                                        Date: 18 June 2001

UNEP/OzL.Pro/ExCom/34/8              Project implementation delays

                                                                        Date: 15 June 2001

UNEP/OzL.Pro/ExCom/34/15            Evaluation of the implementation of the 2000 business plan

                                                                        Date: 18 June 2001

UNEP/OzL.Pro/ExCom/34/16            Status of Article 5 countries in achieving compliance with the initial control measures of the Montreal Protocol, an update by the Fund Secretariat (Decision 32/76)

                                                                        Date: 19 June 2001

UNEP/OzL.Pro/ExCom/34/17            Evaluation of completed compressor projects in China

                                                                        Date: 21 June 2001

UNEP/OzL.Pro/ExCom/34/18            Report of the Twenty-third Meeting of the Sub-Committee on Project Review

                                                                        Date: 18 July 2001

UNEP/OzL.Pro/ExCom/34/19            Issues identified during project review

                                                                        Date: 22 June 2001

UNEP/OzL.Pro/ExCom/34/52 and Add.1         The use of the 13 per cent allowance for support costs (Decision 32/31)

                                                                        Date: 19 June 2001

UNEP/OzL.Pro/ExCom/34/53            Strategic planning

                                                                        Date: 14 June 2001

UNEP/OzL.Pro/ExCom/34/54            Guidelines for the preparation of country programme updates

                                                                        Date: 14 June 2001

UNEP/OzL.Pro/ExCom/34/56/Add.1   Production Sector

                                                                        Date: 19 July 2001

UNEP/OzL.Pro/ExCom/34/CRP.1       A Non-paper by Japan on Concessional Lending

                                                                        Date: 22 June 2001

UNEP/OzL.Pro/ExCom/34/CRP.2       Concessional lending - a proposal from the Government of Japan

                                                                        Date: 18 July 2001

UNEP/OzL.Pro/ExCom/34/CRP.4       Comments by the Finnish delegation to the document on strategic planning: proposals on implementing the framework on the objective, priorities, problems, and modalities for strategic planning of the multilateral fund in the compliance period

                                                                        Date: 18 July 2001

UNEP/OzL.Pro/ExCom/34/CRP.5       Proposal by the Japanese delegation to the document on strategic planning: proposals on implementing the framework on the objective, priorities, problems, and modalities for strategic planning of the multilateral fund in the compliance period

                                                                        Date: 18 July 2001

UNEP/OzL.Pro/ExCom/34/58            Report of the Thirty-fourth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex VIII      Agreed conditions for phase-out of methyl bromide in Romania

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex X          Agreed conditions for phase-out of methyl bromide in Morocco

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex XI         Agreed conditions for phase-out of methyl bromide in cut flowers in Uganda

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex XII       Agreed conditions for phase-out of methyl bromide in Lebanon

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex XIII      Agreed conditions for the phase out of the use of methyl bromide in grain storage in Syria

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex XIV      Agreed conditions for phase-out of methyl bromide in horticulture: tomatoes and cut flowers in Uruguay

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/34/58, Annex XV        Consensus agreement for the Indian halon production and consumption sector

                                                                        Date: 21 July 2001

UNEP/OzL.Pro/ExCom/35/4              Report of the fifteenth meeting of the Sub-Committee of Monitoring, Evaluation and Finance

                                                                        Date: 5 December 2002

UNEP/OzL.Pro/ExCom/35/5              Consolidated draft business plan of the Multilateral Fund for the year 2002

                                                                        Date: 9 November 2001

UNEP/OzL.Pro/ExCom/35/11            Report on the implementation of the monitoring and evaluation work programme for the year 2001

                                                                        Date: 7 November 2001

UNEP/OzL.Pro/ExCom/35/12            Final report on the evaluation of solvent sector projects

                                                                        Date: 8 November 2001

UNEP/OzL.Pro/ExCom/35/13            Draft monitoring and evaluation work programme for the year 2002

                                                                        Date: 30 October 2001

UNEP/OzL.Pro/ExCom/35/14 and Corr.1        Completed projects with balances

                                                                        Date: 28 November 2001

UNEP/OzL.Pro/ExCom/35/15            Implementation delays

                                                                        Date: 9 November 2001

UNEP/OzL.Pro/ExCom/35/16            Report on the performance indicators and proposal on modifications: follow-up to Decision 34/11

                                                                        Date: 1 November 2001

UNEP/OzL.Pro/ExCom/35/17            Progress reports: follow-up to Decisions 34/7 and 34/9

                                                                        Date: 1 November 2001

UNEP/OzL.Pro/ExCom/35/18            Proposed budget of the Fund Secretariat for the year 2002

                                                                        Date: 2 November 2001

UNEP/OzL.Pro/ExCom/35/19            Report of the twenty-fourth meeting of the Sub-Committee of Project Review

                                                                        Date: 4 December 2002

UNEP/OzL.Pro/ExCom/35/20 and Corr.1        Overview of issues identified during project review

                                                                        Date: 10 November 2001

UNEP/OzL.Pro/ExCom/35/60            Strategic planning of the Multilateral Fund revised document 34/53: follow-up to Decision 34/66 (c)

                                                                        Date: 7 November 2001

UNEP/OzL.Pro/ExCom/35/61            Study on defining a starting point for determining the remaining ODS consumption eligible for funding by the Multilateral Fund: follow-up to Decision 34/66 (a)

                                                                        Date: 24 November 2001

UNEP/OzL.Pro/ExCom/35/62            Draft decision on country programme update

                                                                        Date: 8 November 2001

UNEP/OzL.Pro/ExCom/35/63            Report of the Executive Committee’s Subgroup on production sector

                                                                        Date: 6 December 2001

UNEP/OzL.Pro/ExCom/35/66            Concessional lending: follow-up to Decision 34/69

                                                                        Date: 2 November 2001

UNEP/OzL.Pro/ExCom/35/67            Report of the Thirty-fifth Meeting of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex III         Budget for the Fund Secretariat for years 2002, 2003 and 2004

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex VI         Compliance Assistance Programme (CAP) budget

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex VII        Agreed conditions for phase-out of methyl bromide in Bolivia

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex VIII      Agreed conditions for phase-out of methyl bromide in Costa Rica

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex IX         Agreed conditions for phase-out of methyl bromide in Croatia

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex X          Agreed conditions for phase-out of methyl bromide in Turkey

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XI         Agreement for CFC phase out in the polyurethane foam sector in China

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XII       Agreement for the terminal CFC phase out management plan for the Bahamas

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XIII      Agreement for the national CFC phase out plan for Malaysia

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XIV      Agreement for the national CFC phase out plan for Thailand

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XV        Agreement for the total phase out of CFCs in Turkey

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XVI      Adjusted funding policies of the Multilateral Fund

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/35/67, Annex XVII     Format for country programme update

                                                                        Date: 7 December 2001

UNEP/OzL.Pro/ExCom/36/4              Report of the Sixteenth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/5, Corr.1, Corr.2    Report on the extended desk study on clearing house evaluation

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/6              Report on the desk study on MAC projects

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/8/Rev.1, Add.1      Consolidated 2002 business plan of the Multilateral Fund

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/14/Rev.1   Further modifications to resource allocations

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/15 and Corr.1        Implementation delays

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/16            Report of the Twenty-fifth Meeting on the Sub-Committee on Project Review

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/17/Rev.1   Overview of issues identified during project review

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/31            Funding of technology that is not in the public domain

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/32            Implementation of Decision 35/56

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/33, Add.1, Add.2   Report of the Executive Committee’s Subgroup on Production Sector

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/34            Report on the study on alternatives to CFC in rigid foam applications

                                                                        Date: February 2002

UNEP/OzL.Pro/ExCom/36/35            Policy paper on issues surrounding the choice of HCFC-141b for conversion projects

                                                                        Date: 22 February 2002

UNEP/OzL.Pro/ExCom/36/36            Report of the Thirty-sixth meeting of the Executive Committee of the Multilateral Fund for the implementation of the Montreal Protocol

                                                                        Date: 22 March 2002

UNEP/OzL.Pro/ExCom/36/36, Annex II to V   Project performance indicators

                                                                        Date: 22 March 2002

UNEP/OzL.Pro/ExCom/36/36, Annex IX         Agreed conditions for phase-out of methyl bromide in Argentina

                                                                        Date: 22 March 2002

UNEP/OzL.Pro/ExCom/36/36, Annex X          Amended agreement for the phase-out in the ODS production sector in Democratic People’s Republic of Korea

                                                                        Date: 22 March 2002

UNEP/OzL.Pro/ExCom/36/36, Annex XI         Proposal by China, Nigeria and the United States of America

                                                                        Date: 22 March 2002

UNEP/OzL.Pro/ExCom/36/36, Annex XII       Terms of service of the Chief Officer of the Multilateral Fund Secretariat, Japanese proposal

                                                                        Date: 22 March 2002

UNEP/OzL.Pro/ExCom/37/4              Report of the Seventeenth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 16 December 2002

UNEP/OzL.Pro/ExCom/37/5              Status report on the evaluation of aerosol projects

                                                                        Date: 11 June 2002

UNEP/OzL.Pro/ExCom/37/6              Report on the desk study on halon projects

                                                                        Date: 20 June 2002

UNEP/OzL.Pro/ExCom/37/7 and Corr.1          Report on the information collected concerning the status of implementation of MAC projects: follow-up to Decision 36/3

                                                                        Date: 16 June 2002

UNEP/OzL.Pro/ExCom/37/11            Consolidated Progress Report

                                                                        Date: June 2002

UNEP/OzL.Pro/ExCom/37/17 and Corr.1        Evaluation of the implementation of the 2001 business plans

                                                                        Date: 6 June 2002

UNEP/OzL.Pro/ExCom/37/18 and Corr.1        Update report on the status of Article 5 countries in achieving compliance with the initial control measures of the Montreal Protocol;

                                                                        Date: June 2002

UNEP/OzL.Pro/ExCom/37/22            Report of the Twenty-sixth Meeting of the Sub-Committee on Project Review

                                                                        Date:16 December 2002

UNEP/OzL.Pro/ExCom/37/23 and Corr.1        Issues identified during project review

                                                                        Date:26 June 2002

UNEP/OzL.Pro/ExCom/37/58            Draft guidelines for Metered Dose Inhaler (MDI) projects

                                                                        Date: 21 June 2002

UNEP/OzL.Pro/ExCom/37/59            Funding of technology that is not in public domain (follow up to Decision 36/52)

                                                                        Date: 19 June 2002

UNEP/OzL.Pro/ExCom/37/64            Selection of options pursuant to Decision 35/57

                                                                        Date: 18 June 2002

UNEP/OzL.Pro/ExCom/37/65            Guidelines for the preparation, implementation and management of performance-based substance-wide and national ODS phase-out agreements/plans

                                                                        Date: 18 June 2002

UNEP/OzL.Pro/ExCom/37/66 and Corr.1        Business planning: Resource planning and Resource allocations

                                                                        Date: 5 December 2002

UNEP/OzL.Pro/ExCom/Inf.2             Communication Strategy for Global Compliance with the Montreal Protocol (submitted by UNEP DTIE)

                                                                        Date: 9 December 2002

UNEP/OzL.Pro/ExCom/37/71 and Coor.1        Report of the Thirty-seventh meeting of the Executive Committee of the Multilateral Fund for the implementation of the Montreal Protocol

                                                                        Date: 19 December 2002

UNEP/OzL.Pro/ExCom/37/71, Annex III         Agreement for the CFC terminal phase-out management plan for Jamaica

                                      Date: 19 December 2002

UNEP/OzL.Pro/ExCom/37/71, Annex IV         Agreement for the total phase-out of Annex A Group I substances (CFCs) in Brazil

                                      Date: 19 December 2002

UNEP/OzL.Pro/ExCom/37/71, Annex VI         Agreement for phase-out of CFCs in the refrigeration (manufacturing) sector in Indonesia

                                      Date: 19 December 2002

UNEP/OzL.Pro/ExCom/37/71, Annex VII        Agreement for phase-out of CFCs in the foam sector in India

                                      Date: 19 December 2002

UNEP/OzL.Pro/ExCom/38/4              Report of the Meeting of the 18th Sub-Committee on Monitoring, Evaluation & Finance

                                                                        Date: 20 November 2002

UNEP/OzL.Pro/ExCom/38/5 and Corr.1          Final report on the evaluation of aerosol projects

                                                                        Date: 9 October 2002

UNEP/OzL.Pro/ExCom/38/6              Evaluation report on MAC projects in India: follow-up to Decision 37/5 (c)

                                                                        Date: 19 October 2002

UNEP/OzL.Pro/ExCom/38/9              Project implementation delays

                                                                        Date: 18 October 2002

UNEP/OzL.Pro/ExCom/38/10            Project balances

                                                                        Date: 18 October 2002

UNEP/OzL.Pro/ExCom/38/13            Proposed budget of the Fund Secretariat for the year 2003

                                                                        Date: 22 October 2002

UNEP/OzL.Pro/ExCom/38/14            Report of the Meeting of the 27th Sub-Committee on Project Review

                                                                        Date: 20 November 2002

UNEP/OzL.Pro/ExCom/38/15            Overview of issues identified during project review

                                                                        Date: 29 October 2002

UNEP/OzL.Pro/ExCom/38/56            Refrigerant management plans and terminal phase-out management plans (Decision 37/70 (a))

                                                                        Date: 28 October 2002

UNEP/OzL.Pro/ExCom/38/57 and Rev.1         Revised guidelines for the preparation, implementation and management of performance-based sector and national ODS phase-out plans: follow-up to Decision 37/67

                                                                        Date: 25 October 2002

UNEP/OzL.Pro/ExCom/38/58            2003-2005 phase-out plan for the Multilateral Fund (Decision 37/68 (b))

                                                                        Date: 10 November 2002

UNEP/OzL.Pro/ExCom/38/59            Administrative support costs and agency shares

                                                                        Date: 23 October 2002

UNEP/OzL.Pro/ExCom/38/60            Performance indicators

                                                                        Date: 26 October 2002

UNEP/OzL.Pro/ExCom/38/65            Report of the Executive Committee’s Subgroup on Production Sector

                                                                        Date: 21 November 2002

UNEP/OzL.Pro/ExCom/38/67 and Corr.1        Report of the Fund Secretariat on the technical workshop on concessional lending (Decision 35/61)

                                                                        Date: 22 October 2002

UNEP/OzL.Pro/ExCom/38/68            Framework for an information strategy for the Multilateral Fund (Decision 37/1 (b))

                                                                        Date: 8 November 2002

UNEP/OzL.Pro/ExCom/38/69            Communication strategy for global compliance with the Montreal Protocol (Decision 37/72 (b))

                                                                        Date: 16 October 2002

UNEP/OzL.Pro/ExCom/38/70/Rev.1   Report of the Thirty-eighth meeting of the Executive Committee of the Multilateral Fund for the implementation of the Montreal Protocol

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex V Agreement for the national CFC phase-out plan for the Philippines

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex VIII         Agreed conditions for phase-out of methyl bromide in Dominican Republic

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex IX           Agreed conditions for phase-out of methyl bromide in Kenya

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex X Agreement for the plan for phase-out of CFCs in the refrigeration (manufacturing) sector in India

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex XI           Agreement for the plan for phase-out of CFCs in the refrigeration sector in Indonesia

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex XII          Agreement for the national CFC phase-out plan for Nigeria

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex XIII         Agreement with the People’s Republic of China to phase-out CTC and process agents (Phase I)

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex XIV         Guidelines on funding of technology not in the public domain

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/38/70/Rev.1, Annex XV          Agreement for the Argentina Production Sector

                                                                        Date: 20 January 2003

UNEP/OzL.Pro/ExCom/39/6              Report of the meeting of the 19th Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 1 April 2003

UNEP/OzL.Pro/ExCom/39/7              Financial planning for the triennium 2003-2005

                                                                        Date: 8 March 2003

UNEP/OzL.Pro/ExCom/39/8/Rev.1     Consolidated 2003 business plan of the Multilateral Fund

                                                                        Date:24 March 2003

UNEP/OzL.Pro/ExCom/39/9 Corr.1/Rev.1 Corr.2        2003 business plans for bilateral agencies

                                                                        Date: 1 March 2003

UNEP/OzL.Pro/ExCom/39/10 and Corr.1        Business plan for the year 2003 of UNDP

                                                                        Date: 6 March 2003

UNEP/OzL.Pro/ExCom/39/11and Corr.1         Business plan for the year 2003 of UNEP

                                                                        Date: 6 March 2003

UNEP/OzL.Pro/ExCom/39/12            Business plan for the year 2003 of UNIDO

                                                                        Date: 6 March 2003

UNEP/OzL.Pro/ExCom/39/13 and Corr.1        Business plan for the year 2003 of the World Bank

                                                                        Date: 6 March 2003

UNEP/OzL.Pro/ExCom/39/14            Extended desk study on RMP evaluation

                                                                        Date: 6 March 2003

UNEP/OzL.Pro/ExCom/39/15            Results of the analysis of the current procurement procedures of the implementing agencies

                                                                        Date: 4 March 2003

UNEP/OzL.Pro/ExCom/39/19, Corr.1 and 2    Report of the meeting of the 28th Sub-Committee on Project Review

                                                                        Date:1 April 2003

UNEP/OzL.Pro/ExCom/39/20 and Corr.1        Overview of issues identified during project review

                                                                        Date: 24 March 2003

UNEP/OzL.Pro/ExCom/39/38 and Corr.1        Liquid carbon dioxide (LCD) technology and guidelines for LCD projects

                                                                        Date: 7 March 2003

UNEP/OzL.Pro/ExCom/39/41            Information strategy for the Multilateral Fund

                                                                        Date: 6 March 2003

UNEP/OzL.Pro/ExCom/39/43            Report of the Thirty-ninth meeting of the Executive Committee of the Multilateral Fund for the implementation of the Montreal Protocol

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex II          2003 business plan performance indicators for UNDP

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex III         2003 business plan performance indicators for UNEP

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex IV         2003 business plan performance indicators for UNIDO

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex V          2003 business plan performance indicators for the World Bank

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex VII        Agreement for the terminal ODS phase out management plan (TPMP) for Papua New Guinea

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex VIII      Agreement for the terminal CFC phase out management plan (TPMP) for Croatia

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/39/43, Annex X          Agreement for the national phase out plan for Albania

                                                                        Date: 3 April 2003

UNEP/OzL.Pro/ExCom/40/4/Rev.1     Status of contributions and disbursements

                                                                        Date: 16 July 2003

UNEP/OzL.Pro/ExCom/40/5 and Add. 1          Service of the Treasurer (follow-up to Decision 39/3 and Decision 39/4

                                                                        Date: 8 July 2003

UNEP/OzL.Pro/ExCom/40/7              Report of the Twentieth Meeting of the Sub-Committee on Monitoring, Evaluation and Finance

                                                                        Date: 15 July 2003

UNEP/OzL.Pro/ExCom/40/10            Sources of information on procurement procedures of implementing agencies: follow-up to Decision 39/11 (b)

                                                                        Date: 11 June 2003

UNEP/OzL.Pro/ExCom/40/11 Add.1 Add.2/Rev.1        Revised resource allocation for the 2003-2005 triennium (Decision 39/5)

                                                                        Date: 7 June 2003

UNEP/OzL.Pro/ExCom/40/12            Secretariat’s proposal on criteria for project funding to accelerate phase-out and/or to maintain momentum (Decision 39/6 (c) (ii))

                                                                        Date: 25 June 2003

UNEP/OzL.Pro/ExCom/40/13            Consolidated progress report

                                                                        Date: 18 June 2003

UNEP/OzL.Pro/ExCom/40/19/Rev.1   2002 accounts of the Multilateral Fund

                                                                        Date: 12June 2003

UNEP/OzL.Pro/ExCom/40/20 and Corr.1        Evaluation of the 2002 business plans

                                                                        Date: 9 June 2003

UNEP/OzL.Pro/ExCom/40/21            Performance indicators (Decision 38/69)

                                                                        Date: 26 June 2003

UNEP/OzL.Pro/ExCom/40/22            Phase-out from cancelled projects (Decision 39/13)

                                                                        Date: 9 June 2003

UNEP/OzL.Pro/ExCom/40/23            Project implementation delays

                                                                        Date: 8 June 2003

UNEP/OzL.Pro/ExCom/40/24 and Corr.1        Project balances

                                                                        Date: 16 June 2003

UNEP/OzL.Pro/ExCom/40/25/Rev.1   Report on the status of Article 5 countries in achieving compliance with the initial and intermediate control measures of the Montreal Protocol

                                                                        Date: 17 June 2003

UNEP/OzL.Pro/ExCom/40/26            Report of the Twenty-ninth Meeting of the Sub-Committee on Project Review

                                                                        Date: 15 July 2003

UNEP/OzL.Pro/ExCom/40/27 and Add.1         Issues identified during project review

                                                                        Date: 19 June 2003

UNEP/OzL.Pro/ExCom/40/48            Work of the Sub-Committees on Monitoring, Evaluation and Finance and Project Review (Decision 39/2)

                                                                        Date: 26 June 2003

UNEP/OzL.Pro/ExCom/40/49            Information strategy of the Multilateral Fund: work plan with time framework and cost estimates (Decision 39/55)

                                                                        Date: 18 June 2003

UNEP/OzL.Pro/ExCom/40/50            Report of the Fortieth Meeting of the Executive Committee of the Multilateral Fund for the implementation of the Montreal Protocol

                                                                        Date: 18 July 2003

UNEP/OzL.Pro/ExCom/40/50, Annex V          Agreement for the Mexican CFC production sector

                                                                        Date: 18 July 2003

UNEP/OzL.Pro/ExCom/40/50, Annex VI         Agreement for the terminal phase out management plan for Trinidad and Tobago

                                                                        Date: 18 July 2003

UNEP/OzL.Pro/ExCom/40/50, Annex VII        Retirement of Dr. Omar El-Arini, Chief Officer of the Multilateral Fund

                                                                        Date: 18 July 2003

I.    Meetings of the Parties to the Montreal Protocol on Substances that Deplete the Ozone Layer

First............................................... Helsinki.......................................... 02-05 May 1989

Second........................................... London....................... 27-29 June 1990

Third............................................. Nairobi........................................... 19-21 June 1991

Fourth............................................ Copenhagen.......... 23-25 November 1992

Fifth.............................................. Bangkok......................................... 17-19 November 1993

Sixth.............................................. Nairobi........................................... 3-7 October 1994

Seventh.......................................... Vienna............................................ 5-7 December 1995

Eighth............................................ San Jose......................................... 25-27 November 1996

Ninth............................................. Montreal......................................... 15-17 September 1997

Tenth............................................. Cairo.............................................. 23-24 November 1998

Eleventh......................................... Beijing............................................ 29 November-3 December 1999

Twelfth.......................................... Ouagadougou.................................. 11-14 December 2000

Thirteenth....................................... Colombo........................................ 16-19 October 2001

Fourteenth...................................... Rome............................................. 25-29 November 2002

II.  Meetings of the Executive Committee of the Multilateral Fund for the Implementation of the Montreal Protocol

First............................................... Montreal......................................... 19-21 September 1990

Second........................................... Montreal......................................... 17-19 December 1990

Third............................................. Montreal......................................... 15-19 April 1991

Fourth............................................ Nairobi........................................... 17-18 June 1991

Fifth.............................................. Montreal......................................... 18-22 November 1991

Sixth.............................................. Montreal......................................... 27-28 February 1992

Seventh.......................................... Montreal......................................... 23-26 June 1992

Eighth............................................ Montreal......................................... 19-21 October 1992

Ninth............................................. Montreal......................................... 08-10 March 1993

Tenth............................................. Montreal......................................... 28 June-01 July 1993

Eleventh......................................... Bangkok......................................... 10-12 November 1993

Twelfth.......................................... Montreal......................................... 28-31 March 1994

Thirteenth....................................... Montreal......................................... 25-27 July 1994

Fourteenth...................................... Nairobi........................................... 29-30 September 1994

Fifteenth......................................... Montreal......................................... 13-16 December 1994

Sixteenth........................................ Montreal......................................... 15-17 March 1995

Seventeenth.................................... Montreal......................................... 26-28 July 1995

Eighteenth ..................................... Vienna............................................ 22-24 November 1995

Nineteenth...................................... Montreal......................................... 8-10 May 1996

Twentieth....................................... Montreal......................................... 16-18 October 1996

Twenty-first................................... Montreal......................................... 18-20 February 1997

Twenty-second............................... Nairobi........................................... 28-30 May 1997

Twenty-third.................................. Montreal......................................... 12-14 November 1997

Twenty-fourth................................ Montreal......................................... 25-27 March 1998

Twenty-fifth................................... Montreal......................................... 29-31 July 1998

Twenty-sixth.................................. Cairo.............................................. 11-13 November 1998

Twenty-seventh.............................. Montreal......................................... 24-26 March 1999

Twenty-eighth................................ Montreal......................................... 14-16 July 1999

Twenty-ninth.................................. Beijing............................................ 24-26 November1999

Thirtieth......................................... Montreal......................................... 29-31 March 2000

Thirty-first..................................... Geneva........................................... 5-7 July 2000

Thirty-second................................. Ouagadougou.................................. 6-8 December 2000

Thirty-third..................................... Montreal......................................... 28-30 March 2001

Thirty-fourth.................................. Montreal......................................... 18-20 July 2001

Thirty-fifth..................................... Montreal......................................... 5-7 December 2001

Thirty-sixth.................................... Montreal......................................... 20-22 March 2002

Thirty-seventh................................ Montreal......................................... 17-19 July 2002

Thirty-eighth................................... Rome............................................. 20-22 November 2002

Thirty-ninth.................................... Montreal......................................... 2-4 April 2003

Fortieth.......................................... Montreal......................................... 16-18 July 2003



[1] Paragraph 3 (UNEP XE "UNEP" /OzL.Pro/ExCom/34/53): The Secretariat is fully conscious that this exercise of introducing changes is proposed to be made in the modus operandi of an institution which has been in operation XE "operation"  for over 10 years and therefore proposes to take the following approach:

(a)   build on the existing infrastructure: Changes are proposed only after an in-depth review of the existing system to identify any specific deficiencies with a view to rectifying them to make the system function more effectively under the new circumstances;

(b)   determine an appropriate transitional XE "transitional"  period: Since changes must be introduced without interrupting the momentum which has been created in the grace period, adequate time should be made available for the various partners involved to get acquainted with, and implement the changes;

(c)   introduce changes step-wise: The policies, guidelines XE "guidelines"  and operating procedures XE "procedures"  of the Fund have evolved over the yeas into an organic whole and at the same time follow a sequence either on the basis of substance or operational need. For instance the funding policies will determine the kind of implementation modalities and operational guidelines to support the policies, which will in turn, determine the operating procedures that have to be adopted. This will be the sequence that these issues will be reviewed and introduced. As a result the current paper will not address the various operating procedures and business XE "business"  practices, like the performance XE "performance"  indicators of business plans,  however they will have to be reviewed to determine their continued relevance in light of new operating policies and operating modalities of the Fund.

[2] List of products and equipment XE "equipment"  containing a controlled substance specified in Annex A or B of the Montreal Protocol XE "Montreal Protocol" : 1) automobile and truck air conditioning units (whether incorporated in vehicles or not); 2) domestic and/or commercial XE "commercial"  refrigeration XE "commercial refrigeration"  and air conditioning/heat pump equipment (when containing controlled substances XE "controlled substances"  in Annex A or Annex B as a refrigerant XE "refrigerant"  and/or in insulating material of the product) (e.g. refrigerators, freezers, dehumidifiers, water coolers, ice machines, air conditioning and heat pump units); 3) transport refrigeration XE "refrigeration"  XE "transport refrigeration"  units; 4) aerosol XE "aerosol"  products, except medical aerosols XE "aerosols" ; 5) portable fire extinguisher; 6) insulation boards, panels and pipe covers; 7) pre-polymers.

[3] Project documents represent agreements for some agencies.

[4]       The technology license fee is not subject to 10% contingency XE "contingency" .

[5]       +10% contingency  XE "contingency" to be added.

[6] Where it is not feasible to lease the LCD tank, the cost of a tank in the range of US $15,000 - US $25,000 may be included in the capital costs XE "capital costs" .

*       These costs may be omitted if they do not change significantly before and after conversion XE "conversion" .

1       Subject to further analysis and verification, including detailed process calculations if necessary. Field Audit should collect data for such analysis and rule  XE "rule" out sites for expansion, conversion  XE "conversion" and/or revamp based on field factors such as, space limitations, limited access to raw material XE "raw material" s XE "raw materials" , etc.

[7]       Estimates of additional staff time required.

[8] 65 per cent of 1995 production  XE "production" of halon  XE "halon" extinguishers plus 1995 production of CO2  XE "CO2" extinguishers.