Home TOC Index Previous Next


Preliminary data on the production sector


1.   List of plants in the country

Name

 

Location

 

Product List

 

Nominal Capacity

 

Date of Construction

 

Name of Proprietors

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.   Effective production of ODS substances country-wide

Tonnes/Year

 

 

CFC-11

 

CFC-12

 

CFC-113

 

Others*

 

Halon 1211

 

Halon 1301

 

1993

 

 

 

 

 

 

 

1994

 

 

 

 

 

 

 

1995

 

 

 

 

 

 

 

1996 (est.)

 

 

 

 

 

 

 

* To be specified.

3.   Effective production of ODS substances plant by plant

      Data for a plant “X” (one table for one plant**)

Tonnes/Year

 

 

CFC-11

 

CFC-12

 

CFC-113

 

Others*

 

Halon 1211

 

Halon 1301

 

1993

 

 

 

 

 

 

 

1994

 

 

 

 

 

 

 

1995

 

 

 

 

 

 

 

1996 (est.)

 

 

 

 

 

 

 

* To be specified.

** If it is a swing plant, please specify.

3.1  Industry turn over    as % of GNP

                                    as % of Chemical industries

3.2  Quantities of exported CFCs (Optional)

Tonnes/Year

 

 

CFC-11

 

CFC-12

 

CFC-113

 

Others*

 

Halon 1211

 

Halon 1301

 

1993

 

 

 

 

 

 

 

1994

 

 

 

 

 

 

 

1995

 

 

 

 

 

 

 

1996 (est.)

 

 

 

 

 

 

 

* To be specified.

4.   Total employees in the CFC industry

      a)   In the production sector (Direct labour + overheads + maintenance).

      b)   In the packaging sectors

4.1  Total employees per CFC plant (one table per plant)

Number of employees in the plant “...XY...”

 

 

Direct labour

 

Overhead

 

Labs

 

Maintenance

 

Packaging

 

1993

 

 

 

 

 

 

1994

 

 

 

 

 

 

1995

 

 

 

 

 

 

1996 (est.)

 

 

 

 

 

 

FORM FOR THE SECTOR PHASE-OUT PLAN

1.   Strategy for phase-out

a)   Time schedule for the phase-out

Name of the plant

 

Proposed date of shut down

 

Name & Quantities of CFC

 

 

 

 

 

 

 

 

 

 

b)   Proposal of an action plan for phase-out regarding sites

c)   Strategy and action plan regarding manpower

2.   Strategy for production of new substitutes

Substitutes with zero ozone depletion potential: HFCs (including HFC-134a), Hydrocarbons, etc.

Technology and time schedule (2000/2020)

 

Location of the plant

 

Proposed date of start up

 

Name and quantities of substitutes

 

Status of technology

 

Status of the plant *

 

Availability of raw materials

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* New equipment or revamping of the existing plant.

Transitional substances (including HCFC-22, 123a, 141b, 142b, etc.).

Technology and time schedule (2000/2020)

 

Location of the plant

 

Proposed date of start up

 

Name and quantities of substitutes

 

Status of technology

 

Status of the plant *

 

Availability of raw materials

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* New equipment or revamping of the existing plant.

3.   General Comments

TERMS OF REFERENCE FOR THE TECHNICAL AUDIT

Purposes of the Field Audit

While the overall objective of the audit process is to provide all the data needed to review sectoral plans, this information will, of course, be plan specific and will further depend on decisions of the Executive Committee regarding compensation for lost profit and on funding of new production capacity. One can, however, visualize that, although preparation and initial analysis can be carried out anywhere, by such means as distribution of questionnaires, meetings with ODS production sector representatives, etc., obtaining certain information to complete the analysis will require a Field Audit. Broadly, there are three purposes to the Field Audit:

1)   establish utilized (audited) present operating yearly capacity and potential capacity of individual plants and total country production capacity;

2)   determine production history of individual plants and total country production history; and

3)   other relevant technical/commercial information on country and market underlying the sectoral plan which is conveniently gathered in the Field.

Function and Responsibilities of Field Audit Team(s).

Modality of Operation - operate country-by-country, as invited,

Reporting - to the Chief Officer of the Multilateral Fund with input and advice from the Expert Group; and

Composition - Total of at least three with overlapping skills in fluorine technology, process/project/operations, estimating/economics; in addition, a representative from the Expert Group and local expert, as needed.

Issues to be addressed by field audit team

Capacity

Analysis of Field Data and Completion of Audit (by Expert Group, subgroup thereof or consultants).

This builds on the information from the Field Audit teams to create the framework to review sectoral plans. Some tasks may be plan specific, and technical information beyond that garnered in the Field Audit may be required, but typical issues include:

Evaluate ODS production economics for main and/or typical sites, including distribution/transportation costs;

Compare production data to other sources;

Compare production data to results of “capacity audit”;

Evaluate conversion costs, for applicable sites, to HCFC and HFC production, and the resulting production economics and achievable capacities;

Demand estimate based on Country Programmes and downstream projects;

Evaluate sectoral plan data for level of detail needed for costing;

Assess technical feasibility of sectoral plans, reflecting all results of the audit; and

Cost sectoral plans.

Cost and Duration

Cost and duration of a Field Audit will be country specific, depending on the number of sites to be visited. These will typically include the principal production centres as well as repositories of national data, and potentially one or more research centres.

Once the number of sites to be visited is fixed, it becomes possible to estimate the duration of the Field Audit. Given the need for access to key people, etc., it is conceivable that a Field Audit may comprise more than one mission. The duration is converted to a cost by multiplying by the Team size and the cost per manday.

Cost of analysis of the data and completion of the audit will also be plan specific, but will certainly involve at a minimum several man-weeks of work. It is to be noted also that information on new plant economics and future price projections will be needed and will have to be developed or acquired at additional cost.


Home TOC Index Previous Next