Agreement between Cuba and the Executive Committee for the national phase-out of Annex A (Group I) and Annex B (Group II) substances

1.   This Agreement represents the understanding of Cuba (the “Country”) and the Executive Committee with respect to the complete phase-out of controlled use of the ozone depleting substances in the sectors set out in Appendix 1-A (“The Substances”) prior to 2010 compliance with Protocol schedules.

2.   The Country agrees to phase out the controlled use of the Substances in accordance with the annual phase-out targets set out in rows 1 and 5 of Appendix 2-A (“The Targets, and Funding”) and this Agreement. The annual phase-out targets will, at a minimum, correspond to the reduction schedules mandated by the Montreal Protocol. The Country accepts that, by its acceptance of this Agreement and performance by the Executive Committee of its funding obligations described in paragraph 3, it is precluded from applying for or receiving further funding from the Multilateral Fund in respect to the Substances.

3.   Subject to compliance with the following paragraphs by the Country with its obligations set out in this Agreement, the Executive Committee agrees in principle to provide the funding set out in row 17 of Appendix 2-A (“The Targets, and Funding”) to the Country. The Executive Committee will, in principle, provide this funding at the Executive Committee meetings specified in Appendix 3-A (“Funding Approval Schedule”).

4.   The Country will meet the consumption limits for each Substance as indicated in Appendix 2-A. It will also accept independent verification by the relevant Implementing Agency of achievement of these consumption limits as described in paragraph 9 of this Agreement.

5.   The Executive Committee will not provide the Funding in accordance with the Funding Approval Schedule unless the Country satisfies the following conditions at least 30 days prior to the applicable Executive Committee meeting set out in the Funding Approval Schedule:

      (a)  that the Country has met the Target for the applicable year;

      (b)  that the meeting of these Targets has been independently verified as described in paragraph 9;

      (c)  that the Country has substantially completed all actions set out in the last Annual Implementation Programme; and

      (d)  that the Country has submitted and received endorsement from the Executive Committee for an annual implementation programme in the form of Appendix 4 A (“Format for Annual Implementation Programmes”) in respect of the year for which funding is being requested.

6.   The Country will ensure that it conducts accurate monitoring of its activities under this Agreement. The institutions set out in Appendix 5-A (“Monitoring Institutions and Roles”) will monitor and report on that monitoring in accordance with the roles and responsibilities set out in Appendix 5-A. This monitoring will also be subject to independent verification as described in paragraph 9.

7.   While the funding was determined on the basis of estimates of the needs of the country to carry out its obligations under this agreement, the Executive Committee agrees that the country may have the flexibility to reallocate the approved funds, or part of the funds, according to the evolving circumstances to achieve the goals prescribed under this agreement.  Reallocations categorized as major changes must be documented in advance in the next annual implementation programme and endorsed by the Executive Committee as described in sub paragraph 5(d).  Reallocations not categorized as major changes may be incorporated in the approved annual implementation programme, under implementation at the time, and reported to the Executive Committee in the report on implementation of the annual programme.

8.   Specific attention will be paid to the execution of the activities in the servicing sector, in particular:

      (a)  the Country would use the flexibility available under this Agreement to address specific needs that might arise during project implementation; and

      (b)  the technician-licensing programme for the refrigeration and air conditioning service sector would be implemented in stages so that resources can be diverted to other activities, such as additional training or procurement of service tools, if the proposed results are not achieved, and will be closely monitored in accordance with Appendix 5-A of this Agreement.

9.   The Country agrees to assume overall responsibility for the management and implementation of this Agreement and of all activities undertaken by it or on its behalf to fulfil the obligations under this Agreement. UNDP under the mandate of the Multilateral Fund has agreed to be the lead implementing agency (“Lead IA”) in respect of the Country’s activities under this Agreement regulations. The Lead IA under the mandate of the Multilateral Fund will be responsible for carrying out the activities listed in Appendix 6-A (“Role of the Lead Implementing Agency”) including but not limited to independent verification. The country also agrees to periodic evaluations which will be carried out under the monitoring and evaluation work programmes of the Multilateral Fund. The Executive Committee agrees, in principle, to provide the Lead IA and the Cooperating IAs with the fees set out in rows 10, 12, 14 and 16 of Appendix 2-A.

10.  Should the Country, for any reason, not meet the Targets for the elimination of the Substances identified in Appendix 1-A or otherwise does not comply with this Agreement, then the Country agrees that it will not be entitled to the Funding in accordance with the Funding Approval Schedule. In the discretion of the Executive Committee, Funding will be reinstated according to a revised Funding Approval Schedule determined by the Executive Committee after the Country has demonstrated that it has satisfied all of its obligations that were due to be met prior to receipt of the next instalment of Funding under the Funding Approval Schedule. The Country acknowledges that the Executive Committee may reduce the amount of the Funding by the amounts set out in Appendix 7-A (“Reductions in Funding for Failure to Comply”) in respect of each ODP tonne of reductions in consumption not achieved in any one year.

11.  The funding components of this Agreement will not be modified on the basis of any future Executive Committee decision that may affect the funding of any other consumption sector projects or any other related activities in the Country.

12.  The Country will comply with any reasonable request of the Executive Committee and the Lead IA to facilitate implementation of this Agreement. In particular, it will provide the Lead IA with access to information necessary to verify compliance with this Agreement.

13.  All of the agreements set out in this Agreement are undertaken solely within the context of the Montreal Protocol and as specified in this Agreement. All terms used in this Agreement have the meaning ascribed to them in the Protocol unless otherwise defined herein.

14.  This revised Agreement supersedes the Agreement reached between the Government of Cuba and the Executive Committee at the 43rd Meeting of the Executive Committee.

Appendices

Appendix 1-A: The Substances

Annex A:

Group I

CFC-11, CFC-12, CFC-113 CFC-114 and CFC-115

Annex B

Group II

CTC

Appendix 2-A: The Targets and Funding

 

2004

2005

2006

2007

2008

2009

2010

Total

1. Montreal Protocol Reduction Schedules

625.133

312.566

312.566

93.769

93.769

93.769

0.000

 

1A. Max allowable total consumption of CFCs (ODP tonnes)

498.500

312.566

260.000

93.769

0.000

0.000

0.000

 

2. Reduction from on-going projects (MDI and Aerosols) (ODP tonnes)

0.000

0.000

28.200

70.000

39.100

0.000

0.000

137.300

3. New reduction under plan (ODP tonnes)

0.000

185.934

24.366

96.231

54.669

0.000

0.000

361.200

4. Total annual reduction (ODP tonnes)

0.000

185.934

52.566

166.231

93.769

0.000

0.000

498.500

5. Max allowable total consumption of Annex B Group II substances (ODP tonnes)

2.700

0.400

0.400

0.400

0.400

0.400

0.000

 

6. Reduction from ongoing projects

 

 

 

 

 

 

 

 

7. New reduction under plan

 

 

0.100

 

 

 

 

0.100ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿ8ÿ ÿoÿaÿ ÿnÿuÿlÿrÿdÿcÿiÿnÿoÿ ÿnÿeÿ ÿ ÿrÿuÿ ÿIÿfÿnÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ6ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ9ÿ7ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿ ÿ ÿoÿeÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿcÿnÿeÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿeÿtÿrÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ1ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿ ÿ ÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ;ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿnÿsÿ;ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ7ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ3ÿ9ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿ ÿ ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿlÿgÿ=ÿeÿtÿrÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿcÿnÿeÿ;ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ ÿ ÿsÿzÿ=ÿ ÿoÿoÿ=ÿ#ÿ0ÿfÿ0ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ0ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ4ÿ.ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿoÿeÿ ÿ ÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿcÿnÿeÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿeÿtÿrÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ1ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿ0ÿ1ÿ0ÿfÿnÿ ÿoÿoÿ=ÿ#ÿ0ÿfÿ0ÿ>ÿsÿaÿ ÿ ÿsÿyÿeÿ'ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ6ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ5ÿ1ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿ ÿ ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿlÿgÿ=ÿeÿtÿrÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿcÿnÿeÿ;ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ ÿ ÿsÿzÿ=ÿ ÿoÿoÿ=ÿ#ÿ0ÿfÿ0ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ0ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ4ÿ.ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿoÿeÿ ÿ ÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿcÿnÿeÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿeÿtÿrÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ1ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿ ÿ ÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ;ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿnÿsÿ;ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ6ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ5ÿ1ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿ ÿ ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿding:0in 5.4pt 0in 5.4pt'>

 

 

0.100

9. Lead IA agreed funding (UNDP) (US $)

196,228 (i)

566,000 (iii)

461,000

180,000

106.000

50,000

0

1,559,228

10. Lead IA support costs (UNDP) (US $)

14,717 (i)

42,450 (iv)

34,575

13,500

7,950

3,750

0

116,492

11. Cooperating IA agreed funding (Canada) (US $)

400,000

62,000

0

0

0

0

0

462,000

12. Cooperating IA support costs (Canada) (US $)

52,000

8,060

0

0

0

0

0

60,060

13. Cooperating IA agreed funding (Germany) (US $)

43,453 (ii)

0

0

0

0

0

0

43,453

14. Cooperating IA support costs (Germany) (US $)

5,649 (ii)

0

0

0

0

0

0

5,648

15. Co-operating IA agreed funding (France) (US $)

80,319 (ii)

0

0

0

0

0

0

80,319

16. Co-operating IA support costs (France) (US$)

10,441 (ii)

0

0

0

0

0

0

10,441

17. Total agreed funding (US $ )

720,000

628,000

461,000

180,000

106,000

50,000

0

2,145,000

18. Total agency support costs (US $)

82,807

50,510

34,575

ÿfÿnÿ ÿ ÿsÿzÿ=ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿ3ÿ5ÿ0ÿ<ÿoÿtÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿ<ÿpÿnÿ ÿ ÿtÿlÿ=ÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ0ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ4ÿ.ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿoÿeÿ ÿ ÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿrÿgÿtÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿrÿgÿtÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ1ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿ7ÿ9ÿ0ÿfÿnÿ ÿoÿoÿ=ÿ#ÿ0ÿfÿ0ÿ>ÿsÿaÿ ÿ ÿsÿyÿeÿ'ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ6ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ5ÿ1ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿ ÿ ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿlÿgÿ=ÿiÿhÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿiÿhÿ;ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ ÿ ÿsÿzÿ=ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿ,ÿ5ÿ ÿfÿnÿ ÿoÿoÿ=ÿ#ÿ0ÿfÿ0ÿ>ÿsÿaÿ ÿ ÿsÿyÿeÿ'ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ5ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ0ÿ9ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿ ÿ ÿoÿeÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿrÿgÿtÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿrÿgÿtÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ1ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿ0ÿ<ÿoÿtÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿ<ÿpÿnÿ ÿ ÿtÿlÿ=ÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ4ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿlÿgÿ=ÿiÿhÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿiÿhÿ;ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ ÿ ÿsÿzÿ=ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿ9ÿ,ÿ9ÿ<ÿoÿtÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿ<ÿpÿnÿ ÿ ÿtÿlÿ=ÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ<ÿtÿ>ÿ ÿ<ÿrÿsÿyÿeÿ'ÿsÿ-ÿfÿiÿiÿoÿ:ÿ0ÿmÿoÿyÿtÿ-ÿaÿtÿoÿ:ÿeÿ'ÿ ÿ ÿ<ÿdÿwÿdÿhÿ1ÿ8ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ1ÿ3ÿ4ÿpÿ;ÿoÿdÿrÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿoÿdÿrÿtÿpÿnÿnÿ;ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿaÿtÿ ÿ ÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ ÿ ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ9ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿ1ÿ.ÿTÿtÿlÿaÿrÿeÿ ÿrÿnÿ ÿoÿ ÿrÿnÿhÿ ÿUÿ$ÿ ÿfÿnÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿoÿ:ÿ0ÿ7ÿ0ÿ'ÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ ÿ ÿ/ÿdÿ ÿ ÿ<ÿdÿwÿdÿhÿ6ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ9ÿ7ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿ ÿ ÿoÿeÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿrÿgÿtÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿrÿgÿtÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ1ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿle='font-size:9.0pt;font-family:"Times New Roman"; mso-fareast-font-family:SimSun'>802,807

678,510

495,575

193,500

113,950

53,750

0

2,338,092

(i) No funding was approved for UNDP for the 2004 work programme (this funding level has been transferred at the 48th Meeting of the Executive Committee).

(ii) Funding levels reduced at the 48th Meeting of the Executive Committee to reflect the funds transferred to UNDP as the lead implementing agency being the funds not utilized by the Governments of France and Germany for the 2004 and 2005 work programmes.

(iii) US $250,000 approved at the 45th Meeting of the Executive Committee.

(iv) US $18,750 approved at the 45th Meeting of the Executive Committee.

Appendix 3-A: Funding Disbursement Schedule

Funding will be considered for approval at the first (exception this first annual programme) meeting of the year of the annual plan.

Appendix 4-A: Format of Annual Implementation Programme

 

1.

Data

 

 

Country

 

 

Year of plan

 

 

# of years completed

 

 

# of years remaining under the plan

 

 

Target ODS consumption of the preceding year

 

 

Target ODS consumption of the year of plan

 

 

Level of funding requested

 

 

Lead Implementing Agency

 

2.   Targets

Indicators

Preceding year

Year of plan

Reduction

Supply of ODS

Import

 

 

 

Total (1)

 

 

 

Demand of ODS

Manufacturing

 

 

 

Servicing

 

 

 

Stockpiling

 

 

 

Total (2)

 

 

 

3.   Industry Action

Sector

Consumption preceding year (1)

Consumption year of plan (2)

Reduction within year of plan (1)-(2)

Number of projects completed

Number of servicing related activities

ODS phase-out (in ODP tonnes)

Manufacturing

Aerosol

 

 

 

 

 

 

Foam

 

 

 

 

 

Refrigeration

 

 

 

 

 

Solvents

 

 

 

ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿéÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ<ÿtÿ>ÿ ÿ<ÿrÿsÿyÿeÿ'ÿsÿ-ÿfÿiÿiÿoÿ:ÿ'ÿ ÿ ÿ<ÿdÿwÿdÿhÿ9ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ7ÿ5ÿtÿbÿrÿeÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿ ÿ ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿjÿsÿiÿyÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ ÿ ÿiÿeÿ2ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿtÿeÿ<ÿoÿtÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿ<ÿpÿnÿ ÿ ÿtÿlÿ=ÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ ÿ ÿcÿlÿrÿ"ÿ0ÿ7ÿ0ÿ"ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿ ÿ ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿcÿlÿrÿ#ÿ0ÿFÿ0ÿ>ÿoÿpÿ&ÿbÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ ÿ ÿ<ÿtÿ>ÿ ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿ:ÿoÿeÿbÿrÿeÿ-ÿeÿtÿ ÿ ÿnÿnÿ;ÿoÿdÿrÿbÿtÿoÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿbÿrÿeÿ-ÿiÿhÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ ÿ ÿmÿoÿbÿrÿeÿ-ÿoÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿ ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.25in .5in .75in 1.0in'> 

Total

 

 

 

 

 

Servicing

Refrigeration

 

 

 

 

 

 

Total

 

 

 

 

 

 

Grand total

 

 

 

 

 

 

4.   Technical Assistance

      Proposed Activity:    _____________________________

      Objective:                _____________________________

      Target Group:          _____________________________

      Impact:                   _____________________________

5.   Government Action

Policy activity planned

Schedule of implementation

Type of policy control on ODS import: servicing, etc

 

Public awareness

 

Others

 

6.   Annual Budget

Activity

Planned expenditures (US $)

 

 

Total

 

7.   Administrative Fees

Appendix 5-A: Monitoring Institutions and Roles

Institution involved

Role

Responsibility type and frequency of reporting

Evaluation

CITMA, Ozone Office

Overall monitoring

Meetings with IA

Meeting reports, MoU

by Germany

Germany (Proklima)

IA

Expenditure Report

Quarterly Report

by Germany

Germany (Proklima)

IA

Progress report (annual)

Quarterly Report

by Ozone Office

Appendix 6-A: Role of the Lead IA

The Lead IA under the mandate of the Multilateral Fund will be responsible for a range of activities to be specified in the project document along the lines of the following:

      (a)  ensuring performance and financial verification in accordance with this Agreement and with its specific internal procedures and requirements as set out in the Country’s phase-out plan;

      (b)  providing verification to the Executive Committee that the Targets have been met and associated annual activities have been completed as indicated in the annual implementation programme;

      (c)  assisting the Country in preparation of the Annual Implementation Programme;

      (d)  ensuring that achievements in previous Annual Implementation Programme are reflected in future Annual Implementation Programmes;

      (e)  reporting on the implementation of the Annual Implementation Programme of the preceding year and the Annual Implementation Programme for the year are to be prepared and submitted to the first meeting of the Executive Committee of the year;

      (f)  ensuring that technical reviews undertaken by the Lead IA are carried out by appropriate independent technical experts;

      (g)  carrying out required supervision missions;

      (h)  ensuring the presence of an operating mechanism to allow effective, transparent implementation of the Annual Implementation Programme and accurate data reporting;

      (i)   verification for the Executive Committee that consumption of the Substances have been eliminated in accordance with the Targets;

      (j)   coordinate the activities of the Coordinating IAs, if any;

      (k)  ensuring that disbursements made to the Country are based on the use of the Indicators; and

      (l)   providing assistance with policy, management and technical support when required.

Appendix 6-B: Roles of Cooperating Implementing Agencies

1.   The Cooperating IAs will be responsible for:

      (a)  assisting the Country in the implementation and verification of the activities to be undertaken by Canada as funded in rows 11 and 12 of Appendix 2-A and as specified in the project document;

      (b)  ensuring that disbursements are made to the Country in a timely and effective manner;

      (c)  reporting to the Lead Agency on these activities; and

      (d)  providing assistance relating to the activities being undertaken when required.

Appendix 7-A: Reductions in Funding for Failure to Comply

In accordance with paragraph 10 of the Agreement, the amount of funding provided may be reduced by US $11,860 per ODP tonne of reductions in consumption not achieved.

(UNEP/OzL.Pro/ExCom/43/61, Decision 43/27, para. 107).

(Supporting document: UNEP/OzL.Pro/ExCom/43/61, Annex IV).

(UNEP/OzL.Pro/ExCom/48/45, Decision 48/16 (b (iii)), para. 97).

(Supporting document: UNEP/OzL.Pro/ExCom/48/45, Annex VIII).

 