1. This
Agreement represents the understanding of The Former Yugoslav Republic of
Macedonia (the “Country”) and the Executive Committee with respect to the
complete phase-out of controlled use of the ozone depleting substances set out
in Appendix 1-A (”The Substances”) prior to 1 January 2009, a year in advance
of Protocol schedules.
2. The
Country agrees to phase out the controlled use of the Substances in accordance
with the annual phase-out targets set out in Appendix 2-A (“The Targets and
Funding”) and this Agreement. The annual phase-out targets will, at a minimum,
correspond to the reduction schedules mandated by the Montreal Protocol. The
Country accepts that, by its acceptance of this Agreement and performance by
the Executive Committee of its funding obligations described in paragraph 3, it
is precluded from applying for or receiving further funding from the
Multilateral Fund in respect to the Substances.
3. Subject
to compliance by the Country with its obligations set out in this Agreement,
the Executive Committee agrees in principle to provide the funding set out in
row 5 of Appendix 2 A (“The Targets, and Funding”) to the Country. The
Executive Committee will, in principle, provide this funding at the Executive
Committee meetings specified in Appendix 3-A (“Funding Approval Schedule”).
4. The
Country will meet the consumption limits for each Substance as indicated in
Appendix 2-A. It will also accept independent verification by the relevant
Implementing Agency of achievement of these consumption limits as described in
paragraph 8 of this Agreement.
5. The
Executive Committee will not provide the Funding in accordance with the Funding
Approval Schedule unless the Country satisfies the following conditions at
least 60 days prior to the applicable Executive Committee meeting set out in
the Funding Approval Schedule:
(a) that the Country has met the Target for the
applicable year;
(b) that the meeting of these Targets have been
independently verified as described in paragraph 8; and
(c) that the Country has substantially completed
all actions set out in the last Annual Implementation Programme;
(d) that the Country has submitted and received
endorsement from the Executive Committee for an annual implementation programme
in the form of Appendix 4 A (“Format for Annual Implementation Programmes”) in
respect of the year for which funding is being requested.
6. The
Country will ensure that it conducts accurate monitoring of its activities
under this Agreement. The institutions set out in Appendix 5-A (“Monitoring
Institutions and Roles”) will monitor and report on that monitoring in
accordance with the roles and responsibilities set out in Appendix 5-A. This
monitoring will also be subject to independent verification as described in
paragraph 8.
7. While
the Funding was determined on the basis of estimates of the needs of the
Country to carry out its obligations under this Agreement, the Executive
Committee agrees that the Country may use the Funding for other purposes that
can be demonstrated to facilitate the smoothest possible phase-out, consistent
with this Agreement, whether or not that use of funds was contemplated in
determining the amount of funding under this Agreement. Any changes in the use
of the Funding must, however, be documented in advance in the Country’s Annual
Implementation Programme, endorsed by the Executive Committee as described in
sub paragraph 5(d) and be subject to independent verification as described in
paragraph 8.
8. The
Country agrees to assume overall responsibility for the management and
implementation of this Agreement and of all activities undertaken by it or on
its behalf to fulfil the obligations under this Agreement. UNIDO has agreed to
be the lead implementing agency in respect of the Country’s activities under
this Agreement. The Lead IA will be responsible for carrying out the activities
listed in Appendix 6-A including but not limited to independent verification.
The country also agrees to periodic evaluations, which will be carried out
under the monitoring and evaluation work programme of the Multilateral Fund.
The Executive Committee agrees, in principle, to provide the Lead IA with the
fees set out in row 6 of Appendix 2-A.
9. Should
the Country, for any reason, not meet the Targets for the elimination of the
Substances set out in Appendix 1-A or otherwise does not comply with this
Agreement, then the Country agrees that it will not be entitled to the Funding
in accordance with the Funding Approval Schedule. In the discretion of the
Executive Committee, funding will be reinstated according to a revised Funding
Approval Schedule determined by the Executive Committee after the Country has
demonstrated that it has satisfied all of its obligations that were due to be
met prior to receipt of the next instalment of Funding under the Funding
Approval Schedule. The Country acknowledges that the Executive Committee may
reduce the amount of the Funding by the amounts set out in Appendix 7-A in
respect of each ODP tonne of the amount exceeding the Maximum Allowable Total
Consumption of CFCs limit (Appendix 2-A) in any one year.
10. The
funding components of this Agreement will not be modified on the basis of any
future Executive Committee decision that may affect the funding of any other
consumption sector projects or any other related activities in the Country.
11. The
Country will comply with any reasonable request of the Executive Committee and
the Lead IA to facilitate implementation of this Agreement. In particular, it
will provide the Lead IA with access to information necessary to verify
compliance with this Agreement.
12. All
of the agreements set out in this Agreement are undertaken solely within the
context of the Montreal Protocol and as specified in this Agreement, and do not
extend to obligations beyond this Protocol. All terms used in this Agreement
have the meaning ascribed to them in the Protocol unless otherwise defined
herein.
Appendices
Appendix 1-A: The Substances
|
Annex A: |
Group I |
CFC-11, CFC-12 and CFC-115 |
Appendix 2-A: The Targets, and
Funding
|
Year |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
Total |
|
Montreal Protocol Reduction Schedule (ODP
tonnes) |
492.53 |
246.26 |
246.6 |
73.88 |
73.88 |
73.88 |
0 |
n.a. |
|
1. Max allowable total CFC consumption (ODP
tonnes) |
49.34 |
25.0 |
15.0 |
10.0 |
5.0 |
0 |
0 |
n.a. |
|
2. Reduction of CFC consumption from on going
projects (ODP tonnes) |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
3. New reduction under the present plan (ODP
tonnes) |
24.34 |
10.0 |
5.0 |
5.0 |
5.0 |
0 |
0 |
49.34 |
|
4. Total annual reduction of CFC (ODP tonnes) |
24.34 |
10.0 |
5.0 |
5.0 |
5.0 |
0 |
0 |
49.34 |
|
5. Lead I.A. agreed funding (US$) |
- |
154,210 |
79,871 |
15,000 |
15,000 |
15,000 |
- |
279,081 |
|
6. Lead I.A. support cost (US$) |
- |
11,566 |
5,990 |
1,125 |
1,125 |
1,125 |
- |
20,931 |
|
7. Total agreed funding (US$) |
- |
165,776 |
85,861 |
16,125 |
16,125 |
16,125 |
- |
300,012 |
Appendix 3-A: Funding Approval
Schedule
Funding will be considered for approval at the
first meeting of the year of the ”Annual Implementation Programme” including
that for the 2005 ”Annual Implementation Programme”, which is requested at the
45th Meeting.
Appendix 4-A: Format of Annual
Implementation Programme
|
1. |
Data |
|
|
|
Country |
Macedonia |
|
|
Year of plan |
|
|
|
# of years completed |
|
|
|
# of years remaining under the plan |
|
|
|
Target ODS consumption of the preceding year |
|
|
|
Target ODS consumption of the year of plan |
|
|
|
Level of funding requested |
|
|
|
Lead Implementing Agency |
UNIDO |
2. Targets
|
Indicators |
Preceding year |
Year of plan |
Reduction
|
|||
|
Supply of ODS |
Import |
|
|
|
||
|
Total (1) |
|
|
|
|||
|
Demand of ODS |
Manufacturing |
|
|
|
||
|
Servicing |
|
|
|
|||
|
Stockpiling |
|
|
|
|||
|
Total (2) |
|
ÿnÿsÿ;ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ
ÿ ÿ/ÿdÿ
ÿ ÿ<ÿdÿwÿdÿhÿ1ÿ8ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ8ÿ.ÿpÿ;ÿoÿdÿrÿtÿpÿnÿnÿ;ÿoÿdÿrÿlÿfÿ:ÿ
ÿ ÿoÿeÿbÿrÿeÿ-ÿoÿtÿmÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿoÿdÿrÿrÿgÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ
ÿ ÿsÿ-ÿoÿdÿrÿtÿpÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿ
ÿ ÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ
ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿsÿyÿeÿ'ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ ÿiÿeÿ2ÿ
ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ0ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ
ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿ<ÿ:ÿ>ÿnÿsÿ;ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ
ÿ ÿ/ÿdÿ
ÿ ÿ/ÿrÿ
ÿ<ÿtÿbÿeÿ
ÿ
ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿmÿrÿiÿ-ÿoÿ:ÿ.ÿpÿ;ÿaÿgÿnÿrÿgÿtÿ0ÿnÿmÿrÿiÿ-ÿoÿtÿmÿ6ÿ0ÿtÿ
ÿmÿrÿiÿ-ÿeÿtÿ0ÿnÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ
ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ
ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿ.ÿsÿaÿ ÿtÿlÿ=ÿmÿoÿtÿbÿcÿuÿtÿ1ÿ>ÿ ÿ<ÿsÿaÿ>ÿbÿ<ÿpÿnÿ
ÿtÿlÿ=ÿfÿnÿ-ÿeÿgÿtÿbÿlÿ'ÿIÿdÿsÿrÿ ÿcÿiÿnÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ
ÿ
ÿtÿbÿeÿcÿaÿsÿMÿoÿoÿmÿlÿaÿlÿ ÿoÿdÿrÿ0ÿcÿlÿsÿaÿiÿgÿ0ÿcÿlÿpÿdÿiÿgÿ0ÿ
ÿsÿyÿeÿ'ÿaÿgÿnÿlÿfÿ:ÿ.ÿ5ÿtÿbÿrÿeÿ-ÿoÿlÿpÿeÿcÿlÿaÿsÿ;ÿsÿ-ÿaÿdÿnÿ-ÿlÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ
ÿ ÿtÿ ÿtÿlÿ=ÿmÿoÿyÿtÿ-ÿrÿwÿ0ÿ>ÿ
ÿ ÿtÿ ÿiÿtÿ=ÿ0ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿpÿ;ÿoÿdÿrÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ
ÿ ÿsÿ-ÿoÿdÿrÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ
ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿtÿlÿ=ÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿsÿzÿ=ÿ
ÿ ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ
ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿeÿtÿrÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ
ÿ ÿ<ÿtÿ>ÿ
ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ
ÿ ÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿ
ÿ ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ
ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿcÿnÿeÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿeÿtÿrÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ
ÿ ÿiÿeÿ2ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ
ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿoÿsÿmÿtÿoÿ ÿrÿcÿdÿnÿ ÿeÿrÿ(ÿ)ÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ
ÿ ÿ<ÿtÿ>ÿ
ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ
ÿ ÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿ
ÿ ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ
ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿcÿnÿeÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿeÿtÿrÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ
ÿ ÿiÿeÿ2ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ
ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿoÿsÿmÿtÿoÿ ÿeÿrÿoÿ ÿlÿnÿ(ÿ)ÿoÿpÿ<ÿoÿpÿ<ÿsÿaÿ>ÿ/ÿoÿtÿ<ÿpÿ
ÿ ÿ<ÿtÿ>ÿ
ÿ ÿtÿ ÿiÿtÿ=ÿ9ÿvÿlÿgÿ=ÿoÿ ÿtÿlÿ=ÿwÿdÿhÿ6ÿ.ÿ5ÿtÿbÿrÿeÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ1ÿ0ÿtÿ
ÿ ÿbÿrÿeÿ-ÿeÿtÿnÿnÿ;ÿsÿ-ÿoÿdÿrÿlÿfÿ-ÿlÿ:ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿmÿoÿbÿrÿeÿ-ÿlÿ:ÿ
ÿ ÿoÿiÿ ÿiÿdÿwÿeÿtÿ.ÿ5ÿtÿpÿdÿiÿgÿ0ÿnÿ5ÿ4ÿtÿ0ÿnÿ5ÿ4ÿtÿ>ÿ
ÿ ÿpÿcÿaÿsÿMÿoÿoÿmÿlÿaÿiÿnÿcÿnÿeÿ ÿtÿlÿ=ÿtÿxÿ-ÿlÿgÿ:ÿeÿtÿrÿtÿbÿsÿoÿsÿ.ÿ5ÿnÿ.ÿiÿ ÿ7ÿiÿ ÿ.ÿiÿ'ÿ<ÿoÿtÿ
ÿ ÿiÿeÿ2ÿfÿcÿ=ÿTÿmÿsÿNÿwÿRÿmÿnÿ>ÿsÿaÿ ÿtÿlÿ=ÿfÿnÿ-ÿiÿeÿ1ÿ.ÿpÿ;ÿoÿtÿfÿmÿlÿ:ÿTÿmÿsÿNÿwÿRÿmÿnÿ;ÿ
ÿ ÿsÿ-ÿaÿeÿsÿ-ÿoÿtÿfÿmÿlÿ:ÿiÿSÿnÿ>ÿeÿuÿtÿoÿ ÿiÿhÿnÿyÿaÿ ÿfÿpÿaÿ ÿ1ÿ-ÿ2ÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ
ÿ ÿ/ÿdÿ
ÿ ÿ<ÿdÿwÿdÿhÿ8ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ6ÿ7ÿpÿ;ÿoÿdÿrÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ
ÿ ÿoÿdÿrÿlÿfÿ:ÿoÿeÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿaÿtÿ
ÿ ÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ
ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿlÿgÿ=ÿeÿtÿrÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿcÿnÿeÿ;ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ
ÿ ÿsÿzÿ=ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsÿzÿ:ÿ0ÿ0ÿtÿfÿnÿ-ÿaÿiÿyÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ
ÿ ÿmÿoÿfÿrÿaÿtÿfÿnÿ-ÿaÿiÿyÿSÿmÿuÿ'ÿNÿmÿeÿ ÿfÿpÿoÿeÿtÿ ÿoÿpÿeÿeÿ<ÿ:ÿ>ÿ/ÿ:ÿ>ÿ/ÿpÿnÿ<ÿfÿnÿ>ÿ/ÿ>ÿ
ÿ ÿ/ÿdÿ
ÿ ÿ<ÿdÿwÿdÿhÿ8ÿ ÿaÿiÿnÿtÿpÿsÿyÿeÿ'ÿiÿtÿ:ÿ6ÿ7ÿpÿ;ÿoÿdÿrÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ.ÿpÿ;ÿ
ÿ ÿoÿdÿrÿlÿfÿ:ÿoÿeÿmÿoÿbÿrÿeÿ-ÿeÿtÿaÿtÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿsÿ-ÿoÿdÿrÿaÿtÿ
ÿ ÿsÿlÿdÿwÿnÿoÿtÿxÿ ÿ7ÿpÿ;ÿaÿdÿnÿ:ÿiÿ ÿ.ÿpÿ ÿiÿ ÿ.ÿpÿ'ÿ
ÿ ÿ<ÿ ÿlÿsÿ=ÿsÿNÿrÿaÿ ÿlÿgÿ=ÿeÿtÿrÿsÿyÿeÿ'ÿeÿtÿaÿiÿnÿcÿnÿeÿ;ÿaÿ-ÿtÿpÿ:ÿ2ÿiÿ ÿ5ÿnÿ.ÿ5ÿnÿ1ÿ0ÿnÿ>ÿfÿnÿ
ÿ ÿsÿzÿ=ÿ ÿaÿeÿ"ÿiÿeÿ ÿeÿ ÿoÿaÿ"ÿ<ÿpÿnÿsÿyÿeÿ'ÿoÿtÿsize:10.0pt;font-family:"Times New Roman";
mso-fareast-font-family:SimSun'>Number of servicing related activities |
ODS phase-out (in ODP tonnes) |
|||
|
Manufacturing |
||||||
|
Aerosol |
|
|
|
|
|
|
|
Foam |
|
|
|
|
|
|
|
Refrigeration |
|
|
|
|
|
|
|
Solvents |
|
|
|
|
|
|
|
Other |
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
Servicing |
||||||
|
Refrigeration |
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
Grand total |
|
|
|
|
|
|
4. Technical Assistance
Proposed
Activity: _____________________________
Objective: _____________________________
Target
Group: _____________________________
Impact: _____________________________
5. Government Action
|
Policy activity planned |
Schedule of implementation |
|
|
|
|
|
|
|
|
|
6. Annual
Budget
|
Activity |
Planned expenditures (US $) |
|
|
|
|
Total |
|
7. Administrative Fees
Appendix 5-A: Monitoring Institutions
and Roles
1. The
monitoring of this TPMP (Terminal phase-out management plan) will be
coordinated by the National Ozone Unit in cooperation with respective
governmental bodies and also national experts recruited for particular tasks
which would arise in the course of the project implementation.
2. The
following activities will be carried out during the implementation of the TPMP
at different levels. Monitoring of the impact of all measures will be carried
out throughout the implementation period, and consists of measures such as:
(a) evaluation of training courses;
(b) assessment of the level of knowledge of
service technicians in good practice;
(c) check up of all applicants for new R&R
equipment in order to verify their capability;
(d) monitoring of service shops in order to check
whether the equipment is used in the most appropriate way and providing
technical assistance if needed;
(e) verification of the data for recovered and
recycled quantities;
(f) monitoring of the educational centres during
the training courses at the vocational schools; and
(g) monitoring of market developments.
3. An
independent chartered national auditing organization will be recruited to
verify consumption.
Appendix 6-A: Role of the Lead
IA
UNIDO will be responsible for a range of
activities to be specified in the project document along the lines of the
following:
(a) ensuring performance and financial
verification in accordance with this Agreement and with its specific internal
procedures and requirements as set out in the Country’s phase-out plan;
(b) providing verification to the Executive
Committee that the Targets have been met and associated annual activities have
been completed as indicated in the annual implementation programme
(c) assisting the Country in preparation of the
Annual Implementation Programme;
(d) ensuring that achievements in previous Annual
Implementation Programmes are reflected in future Annual Implementation
Programmes;
(e) reporting on the implementation of the Annual
Implementation Programme commencing with the Annual Implementation Programme
for the first year, the report about the implementation to be prepared and
submitted until March 2006;
(f) ensuring that technical reviews undertaken by
the Lead IA are carried out by appropriate independent technical experts;
(g) carrying out required supervision missions;
(h) ensuring the presence of an operating
mechanism to allow effective, transparent implementation of the Annual
Implementation Programme and accurate data reporting;
(i) verification for the Executive Committee that
consumption of the Substances has been eliminated in accordance with the
Targets;
(j) ensuring that disbursements made to the
Country are based on the use of the Indicators;
(k) providing assistance with policy, management
and technical support when required;
(l) assisting the Country in the implementation
and verification of the activities to be undertaken by UNIDO as funded in row 5
of Appendix 2-A and as specified in the project document; and
(m) ensuring that disbursements are made to the
Country in a timely and effective manner.
Appendix 7-A: Reductions in
Funding for Failure to Comply
In accordance with paragraph 9 of the
Agreement, the amount of funding provided may be reduced by US $11,312 per
ODP tonne of reductions in consumption not achieved in the year.
(UNEP/OzL.Pro/ExCom/45/55, Decision 45/42, para. 142).
(Supporting document: